20
SECTION 2
INSTALLATION
2.1 UNPACKING
Units are shipped from the factory. In the event of damages during shipping, it is the
responsibility of the customer to notify the carrier immediately and to file a damage
claim. Open the crate carefully and examine all material inside.
2.2 STORAGE
When storing units, use the original packaging and store under a shelter to protect the
contents from weather.
2.3 SAFETY CONSIDERATIONS
IMPORTANT SAFETY INSTRUCTIONS
READ AND FOLLOW ALL INSTRUCTIONS
SAVE THESE INSTRUCTIONS
WHEN INSTALLING, OPERATING, AND MAINTAINING THIS EQUIPMENT, KEEP
SAFETY CONSIDERATIONS FOREMOST. USE PROPER TOOLS, PROTECTIVE
CLOTHING, AND EYE PROTECTION WHEN WORKING ON OR INSTALLING THE
EQUIPMENT. FOLLOW THE INSTRUCTIONS IN THIS MANUAL AND TAKE ANY
ADDITIONAL SAFETY MEASURES APPROPRIATE. BE EXTREMELY CAREFUL IN
THE PRESENCE OF HAZARDOUS SUBSTANCES.
THE PERSONNEL RESPONSIBLE FOR INSTALLATION, OPERATION, AND
MAINTENANCE OF THIS EQUIPMENT MUST BE FULLY FAMILIAR WITH THE
CONTENTS OF THIS MANUAL.
ANY SERVICING OF THIS EQUIPMENT MUST BE DONE WITH THE UNIT FULLY
OFF AND DISCONNECTED FROM THE POWER SOURCE AND ALL PRESSURE
BLED FROM THE LIQUID LINES.