background image

チコーエアーテック株式会社

 

Copyright CHIKO AIRTEC CO., LTD. 2009   

 

 

 

  3

 

 

 

 

目次

CONTENTS

 

 

1

  製品使用上のご注意

Cautions on Using Product ..................................................................................................... 4

 

1.1

 

全般 

General ............................................................................................................................................. 4

 

1.2

 

運搬・設置・保管・輸送の条件 

  The condition of carry installation, transportation and safekeeping............ 4

 

1.3

 

接続 

Connection ........................................................................................................................................ 4

 

1.4

 

運転 

Operation .......................................................................................................................................... 5

 

1.5

 

修理・分解・改造

    Repair, disassembly and modification ............................................................................ 5

 

1.6

 

廃棄

    Disposal ........................................................................................................................................... 5

 

2

 

製品到着時の確認

  Confirmation and Preparation at Arrival ................................................................................ 5

 

3

 

製品の名称と構造   

Name and Structure of Product .......................................................................................... 6

 

3.1

 

本体名称 

Name of main body .................................................................................................................... 6

 

3.2

 

標準付属品 

Standard accessories ............................................................................................................. 7

 

3.3

 

脱着フランジ 

Desorption flange .................................................................................................................. 7

 

4

 

操作   

Operation. ............................................................................................................................................... 8

 

4.1

 

電源について 

Power supply ........................................................................................................................ 8

 

4.2

 

AT

パネルについて 

  AT panel...................................................................................................................... 8

 

4.3

 

リモートコネクタについて

  Remote connector ................................................................................................ 10

 

4.4

 

運転前の確認

    Confirmation before operation ......................................................................................... 10

 

4.5

 

運転手順 

Operation procedure ................................................................................................................ 11

 

4.6    目詰まりお知らせサイン「C.CC」について

 ........................................................................................................... 11

 

4.7    吸引力低下お知らせサイン「E.EE」について

 ...................................................................................................... 12

 

4.8      設定値変更(閾値)と初期圧の登録確認ついて

............................................................................................... 12

 

5

 

別売リモートケーブルについて 

Remote Cable (Sold Separately) ........................................................................ 13

 

5.1

 

電気回路図 

Electrical circuit diagram ...................................................................................................... 13

 

5.2

 

各線の色と信号について

Color and signal of each wire .............................................................................. 14

 

6

 

保守・点検 

Maintenance and Inspection .......................................................................................................... 16

 

6.1

 

保守点検時の注意事項

Cautions on maintenance and inspection ............................................................ 16

 

6.2

 

フィルタの交換時期について 

Filter replacement timing .............................................................................. 16

 

6.3

 

1次、

2

次フィルタの交換 

Replacement of primary and secondary filters................................................... 17

 

6.4

 

排気フィルタの交換

  Replacement of exhaust filter .................................................................................... 17

 

6.5

 

ヒューズについて 

Fuse .............................................................................................................................. 18

 

6.6

 

日常点検

  Daily inspection ........................................................................................................................ 18

 

7

 

正常に作動しない場合の対策

Countermeasures against Abnormal Operation ................................................... 19

 

8

 

危険シール位置

/

電気回路図

Indication of DANGER Labels/Electrical Circuit Diagram .................................................................... 20

 

8.1

 

CKU-080AT2-HC(-T,-CE)

 

MODEL .......................................................................................................... 20

 

8.2

 

CKU-240AT2-HC(-T,-CE)    MODEL ......................................................................................................... 21

 

8.3

 

CKU-450AT2-HC(-T,-CE)    MODEL ......................................................................................................... 22

 

9

 

本体仕様

    Specifications of Main Body ............................................................................................................ 23

 

10

 

消耗品リスト

  Consumable Parts List .................................................................................................................. 23

 

 

 

Summary of Contents for CKU-080AT2-HC-CE

Page 1: ...that you can use it safely for a long time and enjoy its full performance Symbols used in this manual WARNING This symbol indicates actions that should not be performed in any case or actions that may...

Page 2: ...osene paint etc Explosive dust Aluminum magnesium titanium zinc epoxy etc Dust containing sparks Dust containing sparks generated by high speed cutters grinders welding machines etc Fire sources Cigar...

Page 3: ...irmation before operation 10 4 5 Operation procedure 11 4 6 C CC 11 4 7 E EE 12 4 8 12 5 Remote Cable Sold Separately 13 5 1 Electrical circuit diagram 13 5 2 Color and signal of each wire 14 6 Mainte...

Page 4: ...t outdoors 0 40 80 Install the product in a place without dew condensation at room temperature ambient temperature 0 to 40 C humidity 80 or less High temperature and dew condensation may cause electri...

Page 5: ...of the product properly as industrial waste 2 Confirmation and Preparation at Arrival After unpacking make sure that all parts are provided Contact our company immediately if parts are damaged during...

Page 6: ...e of main body AT AT Panel operation panel Suction port Desorption type MAIN POWER switch BOX Fuse Box Remote connector CKU 450AT2 HC CE V1 MAIN POWER switch Differential pressure sensing gauge Consol...

Page 7: ...ine dust and fumes Secondary filter Protecting the circuit and the electrical parts Exhaust filter Exhaust treatment 3 3 Desorption flange CKU 080AT2 CKU 240AT2 CKU 080AT2 HC 50 38 CKU 240AT2 HC 65 50...

Page 8: ...anel Operating the product with a different power supply may cause a failure Never adopt star burst connection that may cause voltage drop If voltage drop occurs longer time is required for startup ON...

Page 9: ...7 3 3 0 9 99KPa E EE 1 7 0 2 Pa 0 2 Pa The pressure representation when operation stops changes within the range from 0 2 to 0 2 Because there is a change in the atmospheric pressure and the temperat...

Page 10: ...mp of AT panel lights AT ON Press the ON switch AT Panel to start operation The operation indicator lamp lights Confirm that abnormal sounds such as metallic sounds are not generated Confirm that the...

Page 11: ...ator lamp lights Starts the dust collector AT ON Press the ON switch to start the operation Confirm again that abnormal sounds are not generated and confirm that the suction hose offers proper suction...

Page 12: ...Copyright CHIKO AIRTEC CO LTD 2009 12 4 7 E EE E EE 19 7 11 4 5 E EE 4 8 2 050 30 70 50 40 30 70 60 30 2 2 2 1 30...

Page 13: ...ND 7 GND Ability level change input signal 5 Remote Cable Sold Separately 5 1 Electrical circuit diagram Remote operation switch ON Shifting to remote mode Remote control is possible in the ON and the...

Page 14: ...ion switching signal Short circuits the wires 4 and 8 to start remote operation The AT panel is disabled while the wires 4 and 8 are short circuited Yellow 0 5 Yellow white Black White Operation press...

Page 15: ...signal of each wire ON OFF 5 3 Do not short circuit the wires 4 and 8 each other when transferring signals by turning ON and OFF the dust collector from the main body Transfer required output signals...

Page 16: ...ake sure to turn OFF the main power and disconnect the power plug from the electrical outlet to cut off the electricity before starting inspection Using a worn or damaged filter will release sucked du...

Page 17: ...ary filter from the filter case The paper packing of the primary filter is inserted into the cylindrical pipe of the filter case Pull the paper packing toward you to remove the primary filter 2 Open t...

Page 18: ...ody Once day Are no abnormal vibrations or sounds generated Is the installation level correct Filter installation status Once month Are the filters installed securely Filter clogged status Suction for...

Page 19: ...he motor is not overheated by clogged filters 3 30 After checking 1 to 3 above remove the cause of error and press the RESET switch Or turn OFF and ON the MAIN POWER switch to reset the error status S...

Page 20: ...Copyright CHIKO AIRTEC CO LTD 2009 20 8 Indication of DANGER Labels Electrical Circuit Diagram 8 1 CKU 080AT2 HC T CE MODEL...

Page 21: ...Copyright CHIKO AIRTEC CO LTD 2009 21 8 2 CKU 240AT2 HC T CE MODEL...

Page 22: ...Copyright CHIKO AIRTEC CO LTD 2009 22 8 3 CKU 450AT2 HC T CE MODEL...

Page 23: ...2 50 60 7 0 2 9 58 73 30 5 CKU 450AT2 HC T 450 200V Single phase 4 2 50 60 7 0 2 9 58 73 30 5 CKU 450AT2 HC CE 450 220 240V Single phase 4 2 50 60 7 0 2 9 58 73 30 5 1 dB Note The Noise column indica...

Page 24: ...emo about purchase Model Manufacturer s serial number Date of purchase Start of operation Your name Address Phone Person in charge LTD 562 0012 2 27 24 2 27 24 Hakushima Minoh City Osaka apan 562 0012...

Reviews: