background image

I N S T A L L A T I O N     I N S T R U C T I O N S

CHIEF MANUFACTURING INC.
1-800-582-6480

  952-894-6280 FAX 952-894-6918

8401 EAGLE CREEK PKWY, STE. 700
SAVAGE, MINNESOTA 55378  USA

8840-000090

 Rev01

2007 Chief Manufacturing

 

www.chiefmfg.com

11/07

MSB-6510

DISPLAY MOUNTING BRACKET

Prior to assembly, unpack carton completely and verify contents.

If you are missing any of the following components, please contact Customer Service at 1-800/582-6480

(2) Interface Side Brackets

(2) Interface Center Brackets

(4) Mounting Buttons – Tapped

(8) 10-24 x .500 Button Head Cap Screws

(4) M8 x 30mm Phillips Head Cap Screws

(4) .680 x .390 x .625 Nylon Spacers

(1) 1/8” Allen Key

BEFORE PROCEEDING, READ INSTALLATION INSTRUCTIONS COMPLETELY

DISPLAYS ARE EXTREMELY FRAGILE.

NOTE:  If installing screen on a Chief J-series wall mount, proceed

to Step 3 (J-Series VESA Interface Installation).

1.

Chief Q-latch Button Installation (Used with M-series mounts):

Using a 10-24 button head cap screw inserted from back side of bracket, secure mounting button, with
chamfered hole of mounting button (larger surface) facing bracket, to center brackets (four places) (see
Figure 2 & Figure3).

2. Proceed to Step 4 (Side Bracket Assembly).

CAUTION!

Figure 1

Figure 2

Figure 3

Reviews: