Before starting
–
With the generator standing level, check the
engine oil level and top up if necessary. The oil
level must be near to, but not exceed the high mark
on the engine oil level dipstick.
–
Check the coolant level in the expansion tank of
the engine cooling system. The coolant level must
be near to the FULL mark. Add coolant if
necessary.
–
Drain any coolant and sediment from the fuel pre-
filter. Check the fuel level and top up if necessary.
It is recommended to fill the tank after the day’s
operation to prevent coolantdamp in a nearly
empty tank from condensing.
–
Check the vacuum indicator of the air filter. If the
red part shows completely, replace the filter
element.
–
Press the vacuator valve of the air filter to remove
dust.
–
Check the generator for leakage, tightness of wire
terminals, etc. Correct if necessary.
–
Check that fuse F10 has not tripped and that the
emergency stop is in the OUT position.
–
Check that the load is switched off.
–
Check that circuit breaker Q1.1/Q1.2 are switched
off.
Operating Qc1002™
Starting Qc1002™
To start up the unit locally, proceed
as follows:
–
Switch on the battery switch.
–
Switch off circuit breaker Q1.1/Q1.2 . This is not
necessary when a plant contactor is installed
between Q1.1/Q1.2 and the load.
–
Put switch S20 in position I (ON). Voltage is
applied to the Qc1002™ module.
–
The unit can be started manually by pressing the
START button on the Qc1002™ module.
–
The unit starts a preheating cycle which takes 12
seconds.
–
After the preheating period, the unit will start. The
starting attempt will take maximum 12 seconds.
–
Switch on circuit breaker Q1.1/Q1.2 in case no
contactor is installed.
To start up the unit from a remote
location, proceed as follows:
–
Put the starter switch S20 in position I (ON).
Voltage is applied to the Qc1002™ module.
–
The unit can be started from a remote location by
pressing the remote mode button
on the
Qc1002™ module.
–
Switch on circuit breaker Q1.1/Q1.2 .
–
Put the remote start/stop switch in position start.
–
The unit starts a preheating cycle which takes 12
seconds.
–
After the preheating period, the unit will start. The
starting attempt will take maximum 12 seconds.
During operation Qc1002™
Following points should be carried out regularly:
–
Check the engine gauges and the lamps for normal
readings.
–
Check for leakage of oil, fuel or coolant.
–
Avoid long low-load periods (< 30%). In this case,
an output drop and higher oil consumption of the
engine could occur.
–
Check, by means of the generator gauges, that the
voltage between the phases is identical and that
the rated current in the third phase (L3) is not
exceeded.
–
When single-phase loads are connected to the
generator output terminals, keep all loads well-
balanced.
Avoid to let the engine run out of fuel.
If it happened, priming will speed up
the starting.
Summary of Contents for CPG 90-120 JD
Page 1: ...CPG 90 120 JD Instruction Manual for AC Generators English ...
Page 2: ......
Page 19: ... 19 This is the described menu flow for changing the unit type ...
Page 47: ... 47 Circuit diagrams ...
Page 48: ... 48 1310 3200 01 00 Applicable for CPG 90 120 John Deere Power circuit ...
Page 49: ... 49 ...
Page 51: ... 51 ...
Page 52: ... 52 1310 3200 00 00 Applicable for CPG 90 120 John Deere Engine circuit Qc1002TM ...
Page 53: ... 53 ...
Page 55: ... 55 ...
Page 56: ...Printed in Belgium 04 2010 1310 3012 23 www cp com ...