3.0
QUICK CONNECT INTERFACES
All NEO Family Antennas are equipped with a technology called "Quick Base" and required
Quick Connect Cables. The minimum three (3) cables are DC Power Input, General Purpose
Outputs (GPO) (Relay contact pairs) and General Purpose Inputs (Digital Inputs) (GPI).
•
Base configuration has 3 cables total, and the "with Hub" antennas have 4 cables.
•
The number of cables needed will vary per system, per site.
Minimum connections:
Maximum connections:
1.
+24V DC Power
Figure 4: Quick Connect
1.
+24V DC Power
2.
GPO- J6
3.
GPI- J8
4.
Network
Figure 5: Max. cables
Network is available on the "with Hub" models only.
There is no way to repurpose the GPI or GPO cable to provide
this feature, because other hardware is missing.
•
Mounting occurs immediately after securing cable connections. Critical details are below:
Figure 6: Pedestal Mounting
•
One of these is required:
2.5mm T-Wrench
or 2.5mm Allen key
•
Each Extension Cable gets aligned to the appropriate
permanent-installation cable. Three (3) RJ-45 connectors are
provided in the installation kit, for building cables.
•
Finally, the Field Service Technician / Installer will bring the
antenna upright (see Figure 6), and then tighten screws.