7.1.2

 

Plenum PSU Installation 

In the US, if the power supply is to be installed in a plenum (HVAC ventilation) area, the 

GlobTek GS-599MC-KIT(R) (CKP P/N 7367100) must be installed. In the event of such 

an installation, the power supply must be hard wired to comply with section 300.22 (C) of 

the NEC.  
The  kit includes the standard power supply (see Figure 10 above) and plenum-rated 

conversion kit. 

 

7.2

 

PSU 1:1 Rule 

The "Power Supply One to One Rule" for NEO Antennas is required.  
PSU should be wired directly to a pedestal. Powering 2 primary pedestals from one PSU 

in daisy chain configuration is not allowed.  
 

7.3

 

Other Safety Considerations 

Always install using quality 18AWG, 2-Conductor cable routed directly to the NEO 

power input (quick connect cable). 
Only use 1 power connector as the DC Power input (i.e. do not connect 2 power supplies 

directly to 1 reader).  
On the EAS Sensor, J6 and J14 are wired in parallel, allowing the means to supply power 

to an accessory device (rated for +24V DC), provided that the accessory device and NEO 

combined do not draw more current than the PSU rating (e.g. 2.1 amps max current). 
 

7.4

 

Ferrite Core Installation 

7.4.1

 

Quick Connect cable has Ferrite Core pre-applied 

Each NEO is outfitted with a power cable having the noise-suppressing ferrite core 

already applied (see Figure 12). This reduces installation time.  

   

 

      Figure 12: DC Power Extension Cable (Inside System) 

INTERNAL 

SIDE 

EXTERNAL SIDE 

Summary of Contents for Neo NG10

Page 1: ...ONS REVISIONS REV DESCRIPTION DATE ENGINEER REV DESCRIPTION DATE APPROVED 00 CR2660AB 05 30 18 S SINGH 01 ECN8210 08 20 20 S SINGH 02 ECN8212 10 06 20 S SINGH DOC SPEC DATES DWN CHK ENG Size US Letter 10071753 Used On APPD Scale N A Checkpoint Systems Inc 2020 Page 1 of 28 ...

Page 2: ...ponsible for assuring compliance could void the user s authority to operate the equipment in a safe or otherwise regulatory compliant manner WARNING The installation location of the UHF antenna radiating structure must provide a minimum of 20cm 8in separation between the antenna and the human body Please note that this compliance requirement applies to select system models specifically any model t...

Page 3: ...ce from external sources may degrade the system performance which may include intermittent decreases in detection and or intermittent increases in alarm activity However there is no guarantee that interference will not occur in a particular installation If this equipment experiences frequent interference from external sources or does cause harmful interference to radio communications reception whi...

Page 4: ...nd affects all companies producing importing using or placing products on the European market The aim of the REACH regulation is to ensure a high level of protection of human health and the environment from chemical substances Checkpoint Systems substances management system follows and complies with the current revision of the REACH Regulation on the substances as identified by ECHA European Chemi...

Page 5: ... on the System Controller 12 4 1 2 Spare Part Information 12 4 2 All Hardware found in Upper Bay 12 4 2 1 Light and Speaker Board 12 4 2 2 LED Board 13 4 2 3 Speaker 13 4 2 4 USB Devices 13 4 3 EAS Sensor TR4300 board 13 4 3 1 Spare Part information 14 4 4 A1207 PAB SAB Splitter Board 14 4 5 Hub Board 15 4 6 RFID Reader 16 4 7 Remaining Hardware 16 4 7 1 Matching Board 16 4 7 2 GPIO Module 16 4 7 ...

Page 6: ...P20 7 FIGURE 3 NG10 7 FIGURE 4 QUICK CONNECT 11 FIGURE 5 MAX CABLES 11 FIGURE 6 PEDESTAL MOUNTING 11 FIGURE 7 USB WIFI MODULE DONGLE AND USB EXTENSION CABLE 13 FIGURE 8 EAS SENSOR 13 FIGURE 9 PAB ABOVE LEFT AND SAB ABOVE RIGHT HARDWARE IN EACH PEDESTAL RF SIGNAL ROUTING 15 FIGURE 10 50W POWER SUPPLY 25 FIGURE 11 IEC CORD NOT INCLUDED 25 FIGURE 12 DC POWER EXTENSION CABLE INSIDE SYSTEM 26 FIGURE 13...

Page 7: ...tem Identification Figure 1 NP10 Figure 2 NP20 Figure 3 NG10 1 2 System Level Checkpoint Part Numbers SKUs Checkpoint Part Number CKP P N can be considered the SKU of the Finished Good In SAP you will find these System SKU part numbers listed as the Material Item Check SAP to determine which NEO Antennas are currently stocked in your local warehouse Table 1 1 Base Configuration or RF Only Models M...

Page 8: ...WHT 10034983 NG10 PSB HUB GRY RAL 7024 10034663 NG10 PSB HUB WHT W COLES LOGO Table 1 3 PAB SAB Models Model Name System SKU Omnify Description NP10 PAB Models 10035203 NP10 PAB WHT 10035204 NP10 PAB GREY NP10 PAB W HUB Models 10035205 NP10 PAB W HUB WHT 10035206 NP10 PAB W HUB GREY NP10 SAB Models 10035207 NP10 SAB WHT 10035209 NP10 SAB GREY NP20 PAB Models 10035210 NP20 PAB WHT 10035212 NP20 PAB...

Page 9: ... Antennas Model Name System SKU Description NP10 2 2M 10039741 O NP10 PRI 2 2M WHT 10054864 O NP10 PRI 2 2M GREY RAL 7024 NP20 2 0M 10066694 O NP20 PRI 2 0M WHT 10048562 O NP20 PRI 2 0M GREY RAL 7024 1 3 Using this Guide You can review NEO features and learn about the hardware which provides functionality in this document For Product Specifications please see Section 5 0 This document does not pro...

Page 10: ...ection will cause TX RX differences described in more detail below Any PRI model antenna should run in Detector mode whereas a PAB should run in PAB SAB The NEO System Controller and EAS Sensor require minimum Software Firmware and FPGA version to support PAB SAB New supported FPGA version s will also support the alternate mode which is Detector Please note a physical PAB is technically allowed to...

Page 11: ... connections Maximum connections 1 24V DC Power Figure 4 Quick Connect 1 24V DC Power 2 GPO J6 3 GPI J8 4 Network Figure 5 Max cables Network is available on the with Hub models only There is no way to repurpose the GPI or GPO cable to provide this feature because other hardware is missing Mounting occurs immediately after securing cable connections Critical details are below Figure 6 Pedestal Mou...

Page 12: ...aker board covered in section 4 2 1 below 4 1 1 USB Ports on the System Controller There are three 3 connection ports are USB Ports and one 1 is an Ethernet port RJ 45 on one side of the System Controller Each USB Port has a designated function e g the port for Bluetooth the port for the Data cable When you need to swap or install an accessory module be sure you are installing your device in the c...

Page 13: ...r Refer to the installation manual for more detail Figure 7 USB WiFi module dongle and USB Extension cable Note An extension cable is used If you have issues with a device you can try removing the extension cable You can also try reseating the connector or repositioning the module 4 3 EAS Sensor TR4300 board The TR4300 CKP P N 10053101 is a TX RX transceiver we call EAS Sensor or TR4300 board Figu...

Page 14: ...cedures on lower bay replacement and upgrade 4 4 A1207 PAB SAB Splitter Board As described above each EAS Sensor has 2 RF transmit receive circuits When running in PAB SAB the 2 transmit receive circuits operate in a different mode and they are physically connected to PCB hardware called the Splitter Board CKP P N 10034597 which features a 1 2 RF split and LED signal routing With PAB SAB there is ...

Page 15: ...ller IC There is 1 USB Upstream port used for the Upper Bay data connection USB 2 0 interface with the System Controller USB Downstream ports 4 are used as follows 1 EAS Sensor connection USB to UART 2 External USB to Ethernet dongle which is only used on the Master system which connects to the External network The Hub Board has an 10 100 PHY Ethernet switch unmanaged switch 3 RFID Reader USB data...

Page 16: ... are Factory Installed and Ready As Manufactured On the NEO Coupler boards there is no tuning no PCB Jumpers which is different from Evolve 4 7 2 GPIO Module NEO also features a simple I O board which two 2 of the Quick Connect Cables are pre installed into from the factory The Quick Start guide offers complete pin out tables and basic software setup instructions The available interfaces are defin...

Page 17: ... to prep the wire leads no screw driver is required If the provided connector fails during use the FS Technician may install the DC power using a UL approved wire connector junction such as 2 Position terminal block CKP P N 7155630 or equivalent Insulated connectors with a locking lever are also common approved for use so long as they meet local national code for low voltage wiring and have UL app...

Page 18: ...in Width 50 76cm 19 98in Depth front to back 7 72cm 3 04in 5 2 EAS Sensor Mechanical Specs PCB Layers 8 PCB Materials FR4 Dimensions L X W 116mm X 170mm 4 567in X 6 693in Electrical Specs DC Input Output 24V other voltages are available using GPIO and connectors Clock Speed 100 MHz Clock Speed 12 000 MHz Connector function Number Connector type Power Input Output 2 3 Pin 3 5mm connector keyed Powe...

Page 19: ...Blue and Green The jumper setting determines the color of the LED Alarm Light of the Secondary SAB Default is Red Connector function Number Connector type Power Input 1 24V DC input from EAS Sensor s parallel input output from power supply RF Antenna inputs 1 2 Pos terminal strip RF Antenna outputs 2 2 Pin 3 5mm connector keyed GPO Connector 1 RJ 45 pass thru Output cable has one set of GPO relay ...

Page 20: ...Lower Bay and 2 Bluetooth USB Dongle The third available USB port can be used for either WiFi or Cell Modem NG10 has WiFi from factory Audio output Stereo output bare leads are soldered to the PCB terminals to reduce space Ethernet connector Not in use except for field service and or MFG needs HDMI port not in use 5 5 Light and Speaker Board Mechanical Specs PCB Layers 4 PCB Materials FR4 Dimensio...

Page 21: ...tputs 2 The GPO RJ 45 connector has 4 relay contact pairs in total 2 Normally Open N O and 2 Normally Closed N C Each output drives an open and closed contact pair RS 232 serial data interface intended only for support of CPiD RF 1 Connectors 3 RJ 45 and 2 x 12 header male pre installed B2B with EAS Sensor 5 7 Audio Speaker Mechanical Specs Dimensions 2 diameter Square frame OD of frame is approxi...

Page 22: ... specs Connector port 1 7 Pin Hirose connector NP10 NG10 contains PCB A1179 LED NP10 10055944 NP20 contains PCB A1178 LED NP20 10084027 Required Cable available as a FS spare CABLE ASSY LED NEO 10056250 Power input rating 24V 60mA 5 9 Hub Board Mechanical specs PCB Layers 7 PCB Materials FR4 Dimensions 120mm x 123mm approximate outside dimensions 4 72 x 4 82in Electrical Specs DC Power Input 24V D...

Page 23: ...ximate outside dimensions 8 87 x 6 69in Electrical Specs DC Power Input 12V DC Regulated Outputs N A RF UHF Antenna Outputs 4 SMA Female Other Connector Types RJ 45 1 RS 232 Serial port for Service B2B connector 1 2 x 8 Header PCB mount from Hub Board 5 11 Environmental All the internal electronics shall meet or surpass the listed environment specifications Operating Temperature 0 to 60 C Non Cond...

Page 24: ... license only software which will be used by field service engineering and manufacturing to set up NEO Tuning can be performed using DMS Transmit Power and other critical settings are checked set with the help of Analog View and similar software features DMS is also used at the time System installation to pick the LED color pattern and the sound file mp3 played when the EAS Alarm Event occurs ...

Page 25: ...ng Spec CKP P N 10034493 7 1 1 Approved PSU Model Use only the approved power supply The approved PSU is GS 599ES R CKP P N 7116509 This PSU can be installed with or without the hood kit It is the Technician s responsibility to determine when the hood kit is required to meet national and or local code Plenum PSU Installation see section 7 1 2 below is not typical but can be achieved as necessary t...

Page 26: ...tals from one PSU in daisy chain configuration is not allowed 7 3 Other Safety Considerations Always install using quality 18AWG 2 Conductor cable routed directly to the NEO power input quick connect cable Only use 1 power connector as the DC Power input i e do not connect 2 power supplies directly to 1 reader On the EAS Sensor J6 and J14 are wired in parallel allowing the means to supply power to...

Page 27: ...mpliance the ferrite core shown below is considered optional When the DC cord seems to be causing noise then applying any of these types of ferrite cores may mitigate the noise conditions Figure 13 Common Ferrites 1 Ferrite Core is provided in the installation kit however this ferrite is typically not needed see section 4 6 2 describing its intended use Figure 14 Optional Ferrite Core Placement Ne...

Page 28: ...y label will also show country region specific markings indicating approval is obtained in that region As required by Canada IC Industry Canada all NEO units internal labels shall bear text IC 3356B NEO Cellular IC 6369A MS2372H517 Wi Fi 10531A 80804XX Bluetooth 11232A USBBT1EDR4 8 2 External Label Each NEO has a second label which shows the Model Name and serial number of the unit manufactured Th...

Reviews: