7.1.2
Plenum PSU Installation
In the US, if the power supply is to be installed in a plenum (HVAC ventilation) area, the
GlobTek GS-599MC-KIT(R) (CKP P/N 7367100) must be installed. In the event of such
an installation, the power supply must be hard wired to comply with section 300.22 (C) of
the NEC.
The kit includes the standard power supply (see Figure 10 above) and plenum-rated
conversion kit.
7.2
PSU 1:1 Rule
The "Power Supply One to One Rule" for NEO Antennas is required.
PSU should be wired directly to a pedestal. Powering 2 primary pedestals from one PSU
in daisy chain configuration is not allowed.
7.3
Other Safety Considerations
Always install using quality 18AWG, 2-Conductor cable routed directly to the NEO
power input (quick connect cable).
Only use 1 power connector as the DC Power input (i.e. do not connect 2 power supplies
directly to 1 reader).
On the EAS Sensor, J6 and J14 are wired in parallel, allowing the means to supply power
to an accessory device (rated for +24V DC), provided that the accessory device and NEO
combined do not draw more current than the PSU rating (e.g. 2.1 amps max current).
7.4
Ferrite Core Installation
7.4.1
Quick Connect cable has Ferrite Core pre-applied
Each NEO is outfitted with a power cable having the noise-suppressing ferrite core
already applied (see Figure 12). This reduces installation time.
Figure 12: DC Power Extension Cable (Inside System)
INTERNAL
SIDE
EXTERNAL SIDE