3-4 SECTION 3
–
MAINTENANCE
3
-4
S
E
CT
IO
N 3
–
MA
IN
T
E
NANC
E
S
CH
E
DUL
E
Maintenance Schedule
MAINTENANCE SCHEDULE
INSTRUMENT NAME
COMPONENT
EACH TEST
MONTHLY
3 MONTHS
6 MONTHS
ANNUAL
Sample Rack and Containers
Disassemble, Clean,
Inspect
Motor Drive
Disassemble, Clean, Inspect
Oil
Replace
Low Pressure Filter
Replace
High Pressure Filter
Disassemble, Clean,
Inspect
Replace
Cylinder Pressure Release Valve
Replace
Cylinder
Clean, Inspect, Replace
Mineral Oil
Air to Cylinder Valve
Replace
Air Operated Valve
Disassemble, Replace
Needle, Seat
Pump
Maintenance by Qualified
Factory Service Technician
Pressure Gauge
⚫
Calibration
Temperature Controller Thermocouple
Inspect
⚫
Calibration
Calibration by Qualified
Factory Service Technician
Pressure Transducer
Inspect
⚫
Calibration
Calibration by Qualified
Factory Service Technician
Heater
Test by Qualified Factory
Service Technician
Reservoir
Clean-out by Qualified
Factory Service Technician
Rupture Disc
Replace
This maintenance schedule applies to normal usage of two tests per day. Detailed procedures for these operations are contained in your manual.
⚫
Per API Specifications
Where Applicable
Summary of Contents for AMETEK 5617
Page 3: ......
Page 9: ...P 4 PREFACE This page is intentionally left blank ...
Page 23: ...5 2 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 29: ...5 6 SECTION 5 REPLACEMENT PARTS This page is intentionally left blank ...
Page 31: ...6 2 SECTION 6 DRAWINGS AND SCHEMATICS This page is intentionally left blank ...
Page 32: ......
Page 33: ...CHANDLER ENGINEERING ...
Page 36: ...TB1 TB2 ...
Page 37: ...CHANDLER ENGINEERING ...
Page 38: ......