
6
CET Electric Technology
Chapter 2 Installation
2.1 Appearance
Figure 2-1 Appearance
Figure 2-2 Upper Connector Arrangement
Figure 2-3 Lower Connectors Arrangement
2.2 Mounting
The PMC-1302 ESG should be installed in a dry environment with no dust and kept away from heat,
radiation and electrical noise sources.
Installation steps:
Before installation, make sure that the DIN rail is already in place.
Move the installation clip at the back of the PMC-1302 downward to the “unlock” position.
Align the top of the mounting channel at the back of the PMC-1302 at an angle against the top of
the DIN rail as shown in Figure 2-4 below.
Rotate the bottom of the PMC-1302 towards the back while applying a slight pressure to make
sure that the device is completely and securely fixed on to the DIN rail.
Push the installation clip upward to the “lock” position to secure the PMC-1302 on to the DIN
Rail.