Installation Guide for FibeAir IP-20S, FibeAir IP-20S Assured
Page 76 of 105
Ceragon Proprietary and Confidential
2 Connect the RFU-C OMT Kit to the antenna and secure it with four screws.
Verify the existence of the O-ring.
Figure 24: Connect OMT Kit to Antenna
3 Mount the two O-Rings supplied with the RFU-C OMT kit on the OMT body.
Make sure the mounting direction is correct, as shown in the section view.
4 Mount both RFUs, using the four M8 captive screws and washers supplied,
assembled, in the IP-20S, through the radio and OMT holder, and tighten the
screws. Make sure the polarization mounting direction is correct.