9. Commissioning
The DC breaker is a protection device. When modules are plugged in a system please make sure the corresponding DC
breaker is engaged in the ON position. Failure to observe this rules will result not to have all module operating when
running on DC.
Installation and commissioning must be done and conducted by trained people fully authorized to act on installation.
It is prohibited to perform any isolation test without instruction from manufacturer.
Equipments are not covered by warranty if procedures are not respected.
Commissioning