12. Commissioning
The inverter module DC input breaker acts as a protective device. When the modules are inserted into a system the DC
breaker can then be turned ON to activate the DC input of the module.
Installation and commissioning must be done and conducted by trained people fully authorized to act on installation.
It is prohibited to perform any insulation test without instruction from manufacturer.
Equipment is not covered by warranty if procedures are not followed.
12.1 Check list
Refer the document “Commissioning Procedure” and available on request.
Commissioning