CE-2500-HVE Band Sealer
Page 12
6.5.
Conveyor Belt Adjustment / Replacement
When making adjustments to the conveyor table, loosen two nuts (1) at the bottom of the
conveyor table. There are three location holes on the housing (2), insert bolts in them as
needed, then fasten the nuts. Then move the conveyor table and equip the connecting shaft
(3) that would be in the spare parts into the universal joints. (see diagram 6.4).
Diagram 6.4
1 101334
Adjusting Knob
2 101335
Foot Rest
Summary of Contents for CE-2500-HVE
Page 9: ...CE 2500 HVE Band Sealer Page 8 Diagram 5 3...
Page 16: ...CE 2500 HVE Band Sealer Page 15 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12...
Page 17: ...CE 2500 HVE Band Sealer Page 16 Step 13...
Page 18: ...CE 2500 HVE Band Sealer Page 17 VIII Stand Assembly Included Parts Assemblied Stand...
Page 22: ...CE 2500 HVE Band Sealer Page 21 X Sealing Unit Parts List Diagram 10 1...
Page 24: ...CE 2500 HVE Band Sealer Page 23 XI Conveyer Parts List Diagram 11 1 18 19 20 18...
Page 26: ...CE 2500 HVE Band Sealer Page 25 XII Component Parts List Diagram 12 1...
Page 28: ...CE 2500 HVE Band Sealer Page 27 XIII Conveyor Table Parts List Diagram 13 1...