3 Set-up for operation
3.1 Connecting the Terminal
3.1.1
Connecting to a GPS receiver
Use of a
GPS
receiver is required for correct operation of the
CCI.Command
.
For information, please refer to the chapter
Connecting with a GPS receiver
in
the
CCI.GPS
operating instructions.
3.1.1.1
GPS data requirements
The following framework conditions must be adhered to for operation with
Command:
Baud
19200
GGA + RMC + VTG
5 Hz
GSA
1 Hz
GSV (optional)
1 Hz
3.1.2
Connecting with the external lightbar CCI L10
CCI.Command
provides the option of using the external lightbar CCI L10.
Proceed as follows to connect the external lightbar to the
terminal:
1. Connect the external lightbar CCI L10 to the
terminal
's LIN
interface
.
Summary of Contents for CCI 50
Page 2: ...CCI 50 ISOBUS Terminal Operating instructions Reference Release 5 50...
Page 62: ...55 A Appendix Menu structure...
Page 64: ...CCI Cam Visual implement monitoring Operating instructions Reference CCI Cam v5...
Page 90: ...CCI Control Documentation and task management Operating instructions Reference CCI Control v4...
Page 196: ...107 10 Notes...
Page 199: ...110 Edit 38...
Page 200: ...CCI TECU Tractor data Operating instructions Reference CCI TECU v6...
Page 338: ...CCI GPS GPS settings and tractor geometry Operating instructions Reference CCI GPS v2...