Oven Purge and Pressurize System Function
A safe gas supply is required to purge and over-pressurize the oven electronics and heating elements
safety enclosures before the oven can be turned on. The compressed gas may be:
•
Air of instrument quality
•
Gas nitrogen (GN
RR
2
RR
)
Oven Chamber Backfilling Function
In its default configuration, the oven uses the purge and pressurize gas supply to backfill the
vacuumed down oven chamber.
Optional:
A second clean air or gas nitrogen supply can be
attached to the Backfill port to backfill the oven chamber with a gas source separate from the
purge and pressurize system source.
Your process SOP or recipes must state which gas source will be used to backfill the oven chamber.
Purge and Pressurize Gas Supply System Requirements
•
The oven requires a sustained flow of
4.2 cubic feet per minute
of gas flow to purge the
electronics and heating elements enclosures and to establish and maintain overpressure
(117.5 normal liters per minute).
•
The gas supply tubing connected to the oven must be protected against mechanical
damage and accidental disconnection.
•
The
gas supply system must have a power source separate from the oven
If it is
electronically controlled or generated.
•
The gas system must supply a continual flow of gas to the oven during oven operation.
Connection Requirements
Use ¼ inch OD (outside dimension) tubing to connect to the ¼ inch gas port fittings on the back
of the oven. These ports are labeled
Purge & Pressurize
and
Backfill.
Use tubing clamps to
secure the tubing to the fitting.
Continued next page
Summary of Contents for CVO-5-EX Series
Page 1: ...Flammable Solvent Ovens Installation Operation Manual CVO 5 EX Oven Series...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 Special Conditions Of Use 131...
Page 7: ...7 P a g e cascadesciences com Tel 503 847 9047 TABLE OF CONTENTS...
Page 11: ...11 P a g e cascadesciences com Tel 503 847 9047 SAFETY CERTS AND STATEMENTS...
Page 17: ...17 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 22: ...22 P a g e cascadesciences com Tel 503 847 9047...
Page 24: ...24 P a g e cascadesciences com Tel 503 847 9047 These groups include propane and n butane...
Page 29: ...29 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 37: ...37 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 39: ...39 P a g e cascadesciences com Tel 503 847 9047...
Page 44: ...44 P a g e cascadesciences com Tel 503 847 9047 RECEIVING...
Page 51: ...51 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 54: ...54 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 61: ...61 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 65: ...65 P a g e cascadesciences com Tel 503 847 9047 INSTALLATION...
Page 67: ...67 P a g e cascadesciences com Tel 503 847 9047 SYMBOLS...
Page 69: ...69 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 72: ...72 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 95: ...95 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 104: ...104 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 116: ...116 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 123: ...123 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 125: ...125 P a g e cascadesciences com Tel 503 847 9047 Continued next page...
Page 127: ...127 P a g e cascadesciences com Tel 503 847 9047 End of Procedure...
Page 128: ...128 P a g e cascadesciences com Tel 503 847 9047 MAINTENANCE...
Page 130: ...130 P a g e cascadesciences com Tel 503 847 9047 REPLACEMENT PARTS...
Page 132: ......