27
HOW TO INSTALL DB-II Series
1. Open the box with care because indicator is connected to the scale with
load cell wire.
2. Turn the post knob so as to fix indicator.
3. Pull down the wire out of post pipe and insert the post pipe to the post
bracket. (Refer to fig. 1)
4. Fasten the post pipe with two bolts. (Refer to fig. 1)
A long bolt should be connected to the upper side.
5. Insert the wire to the post pipe. (Refer to fig. 2, 3)
6. If the scale is not properly level, please adjust 4 leg(adjusting bolt) at the
bottom of the scale so as to center the bubble of the leveling gauge.
※
Note : Place the scale on a flat and stable surface.
Inside the indicated circle.
Summary of Contents for DB-II series
Page 1: ...2 ...
Page 3: ...4 PRECAUTIONS ...
Page 4: ...5 ...
Page 28: ...29 MEMO ...
Page 29: ...30 MEMO ...
Page 30: ...31 MEMO ...
Page 31: ...32 ...