17
4. Installation
4.1 Installation Site
(1) Power Requirements
x
Select an installation site that is near a power source to allow the use of the attached AC
adapter or a site where the special accessory battery pack can be properly used.
Verify that the power voltage conforms to that indicated on the AC adapter.
(2) Installation site
The balance must be installed in a proper place to ensure safe and accurate
measurement. Avoid the following types of sites.
• Sites with air current from air conditioners,
ventilators, open doors, or windows.
• Sites with vibration.
• Sites in direct sunlight.
Summary of Contents for CAU Series
Page 1: ...2 ...
Page 5: ...6 ...
Page 117: ...118 MEMO ...
Page 118: ...119 ...
Page 119: ...120 ...