![Carrier PIC 5+ Installation, Operation And Maintenance Instructions Download Page 94](http://html.mh-extra.com/html/carrier/pic-5/pic-5_installation-operation-and-maintenance-instructions_2562218094.webp)
94
7.9 Manual Guide Vane Operation
It is possible to manually operate the guide vanes in order to check control operation or to control the guide vanes
in an emergency. Manual operation is possible by overriding the target guide vane position.
NOTE: Manual control overrides the configured pulldown rate during start-up and permits the guide vanes to open
at a faster rate. Motor current above the electrical demand setting, capacity overrides, and chilled water
temperature below the control point override the manual target and close the guide vanes. For descriptions of
capacity overrides and set points, please refer to separated PIC5+ Control User Manual.
7.10 Service and operation Log
A service and operation log (as shown in
Fig. 52
), is a convenient checklist for routine inspection and
maintenance and provides a continuous record of chiller performance. It is also an aid when scheduling routine
maintenance and diagnosing chiller problems. Keep a record of the chiller pressures, temperatures, and liquid
levels. Automatic recording of data is possible by using CCN devices such as the Data Collection module and a
Building Supervisor.
Contact a Carrier representative for more information.
SERVICE AND OPERATION LOG CARRIER 19DV SEMI-HERMETIC CENTRIFUGAL
REFRIGERATION MACHINE
JOB SITE :
MACHINE
MODEL NO.
MACHINE
SERIAL NO
DESCRIPTION
Date
COOLER
REFRIGERANT
PRESSURE SAT
LIQUID TEMP
LEVEL
WATER
FLOW
TEMP IN
TEMP OUT
CONDENSER
REFRIGERANT
PRESSURE
TEMP SAT
WATER
FLOW
TEMP IN
TEMP OUT
COMPRESSOR
CAPACITY
GV1 ACTUAL POS
GV2 ACTUAL POS
BEARINGS
1ST STAGE TEMP
2ND STAGE TEMP
REFRIGERANT
LUBE
BEARING DELTA P
REF PUMP DELTA P
DRIVE TRAIN
MOTOR
RUNNING AMPS
TEMPERATURE
VFD
ACTUAL SPEED
PURGE
RUNTIME
AV DAILY PURGE IN 7 DAYS
Fig 52
– Service and operation log
Summary of Contents for PIC 5+
Page 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Page 52: ...52 Fig 24 19DV control box ...
Page 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Page 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Page 57: ...57 ...
Page 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Page 114: ...114 Detailed menu description ...
Page 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...