5.8 Software configuration
WARNING: Do not operate the chiller before the control configurations have been checked and a Calibration and
Control Test has been satisfactorily completed. Protection by safety controls cannot be assumed until all control
configurations have been confirmed.
See the 19DV with PIC 5+ Controls Operation and Troubleshooting manual for instructions on using the PIC 5+
interface to configure the 19DV unit. As the unit is configured, all configuration settings should be written down.
The welcome screen is the first screen shown after switching the unit on or after the re-animation of the screen. It
displays the application name as well as current software version number.
Fig 43: Welcome screen
5.8.1 Input the Design Set Points
To access the set point screen, press the Main Menu icon on the home screen. See
Fig. 44
Fig 44: main menu icon
The Main Menu screen is displayed. Press the Setpoint Table
icon (Fig. 45
).
Summary of Contents for PIC 5+
Page 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Page 52: ...52 Fig 24 19DV control box ...
Page 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Page 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Page 57: ...57 ...
Page 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Page 114: ...114 Detailed menu description ...
Page 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...