62
3. Crimp one no. 8 size spring spade terminal on each conductor.
4.
Attach red to “+” terminal and white to “G” terminal and black to “–” terminal of CCN Network interface
located in the PIC5+ touch screen panel.
1: drain wire
2 : ground drain wire
3 : PIC5+ touch screen panel
4 : CCN wiring
______ : factory wiring
- - - - - - : field wiring
Fig 33
– CCN network wiring
4 START-UP/SHUT-DOWN/RECYCLE SEQUENCE
4.1 Local Start/Stop Control
Local start-up (or manual start-up) is initiated by pressing the gray Start/Stop icon on the HMI interface. See fig 34
Fig 34
– Chiller start/stop icon
This initiates the PIC5+ starting sequence by displaying the list of operating modes. Press Local On to initiate
start-up. See
Fig. 35
.
Summary of Contents for PIC 5+
Page 26: ...26 VFD not shown Fig 13 Sensors actuators location ...
Page 52: ...52 Fig 24 19DV control box ...
Page 53: ...53 1 Power supply 24V AC 2 LEN 3 CCN 4 Ethernet 5 USB Fig 25 19DV HMI box rear view ...
Page 54: ...54 Fig 26 19DV IOB1 wiring Fig 27 19DV IOB2 wiring ...
Page 57: ...57 ...
Page 113: ...113 APPENDIX A SmartView SCREEN AND MENU STRUCTURE ...
Page 114: ...114 Detailed menu description ...
Page 116: ...116 APPENDIX B MAINTENANCE SUMMARY AND LOGSHEETS Cont 19DV monthly Maintenance Log ...