Remove the dust and clean the interior of the control 

boxes, if required.

• 

Check the presence and the condition of the electrical 

protection devices.

• 

Check the correct operation of all heaters.

• 

Replace the fuses every 3 years or every 15000 hours 

(age-hardening).

• 

Replace the control box cooling fans used with option 
22 (with designation EF22_) every five years.

• 

Check the height of the anti-vibration mountings 

(located between the compressor rails and the unit 
chassis) after 5 years of operation, and then each year. 
When the total minimum height of the mountings is 
less than 25 mm replace the mountings.

• 

Check the water connections.

• 

Purge the water circuit.

• 

Clean the water filter.

• 

Fully clean the condensers with a low-pressure jet and 

a bio-degradable cleaner (counter-current cleaning - 
see chapter 13.6.2 - “Level 2”).

• 

Replace the stuffing box packing of the pump after 

10000 hours of operation.

• 

Check the unit operating parameters and compare 

them with previous values.

• 

Keep and maintain a maintenance sheet, attached to 

each HVAC unit.

• 

Check the correct operation of the capacitor (power 

factor correction option 231).

All these operations require strict observation of adequate 
safety measures: Individual protection garments, compliance 
with all industry regulations, compliance with applicable 
local regulations and using common sense. 

13.3 - Level 3 (or higher) maintenance

NOTE: Any deviation or non-observation of these mainte-
nance criteria will render the guarantee conditions for the 
HVAC unit null and void, and the manufacturer, Carrier 
SCS will no longer be held responsible.

The maintenance at this level requires specific skills/

approval/tools and know-how and only the manufacturer, 
his representative or authorised agent are permitted to 
carry out these operations. These maintenance operations 
concern for example:

• 

A major component replacement (compressor, 

evapo-rator)

• 

Any intervention on the refrigerant circuit (handling 

refrigerant)

• 

Changing of parameters set at the factory (application 

change)

• 

Removal or dismantling of the HVAC unit

• 

Any intervention due to a missed established mainte-

nance operation

• 

Any intervention covered by the warranty.

13 - STANDARD MAINTENANCE

Air conditioning equipment must be maintained by profes-
sional technicians, whilst routine checks can be carried out 
locally by specialised technicians. See the standard 
EN 378-4.

Simple preventive maintenance will allow you to get the 
best performance from your HVAC unit:

• 

Improved cooling performance

• 

Reduced power consumption

• 

Prevention of accidental component failure

• 

Prevention of major time-consuming and costly 

inter-ventions

• 

Protection of the environment.

There are five maintenance levels for HVAC units, as 
defined by the AFNOR X60-010 standard.

13.1 - Level 1 maintenance

See note “Any deviation or non-observation ...” in chapter 
13.3 - “Level 3 (or higher) maintenance”. Simple 
procedure can be carried out by the user:

• 

Visual inspection for oil traces (sign of a refrigerant 

leak)

• 

Air heat exchanger (condenser) cleaning - see chapter  

13.6.1 - “Level 1”.

• 

Check for removed protection devices, and badly 

closed doors/covers

• 

Check the unit alarm report when the unit does not 

work. Refer to the 30XA/30XAS/30XW Touch Pilot 
control manual for a more detailed explanation.

 
General visual inspection for any signs of deterioration.
 

13.2 - Level 2 maintenance

See note “Any deviation or non-observation ...” in the ext 

column. This level requires specific know-how in the 
electrical, hydronic and mechanical fields. It is possible that 

these skills are avail-able locally: Existence of a 
maintenance service, industrial site, specialised 
subcontractor. In these cases, the following maintenance 
operations are recommended.

Carry out all level 1 operations, then:  

• 

At least once a year tighten the power circuit 

electrical connections (see table 13.4).

• 

Check and re-tighten all control/command 

connections, if required (see table 13.4).

• 

Check the differential switches for correct operation 

every 6 months (free-cooling option 118A).

Summary of Contents for Aquaforce 30XA Series

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE INSTRUCTIONS Air Cooled Screw Chillers 30XA A Nominal cooling capacity 267 1682 kW 50 Hz Unit with options 23A 258 and 279 Original document...

Page 2: ...XA 1702 module 1 2 MCHE heat exchanger standard and 30XA 1702 module 1 2 Cu Al heat exchanger option 254 255 15 3 11 30XA 1702 module 2 2 MCHE heat exchanger standard and 30XA 1702 module 2 2 Cu Al he...

Page 3: ...control 42 9 8 Heat reclaim operation 42 9 9 Condenser pump selection 42 9 10 Frost protection 43 10 FANS WITH AVAILABLE PRESSURE OPTION 10 43 11 MAJOR SYSTEM COMPONENTS AND OPERATION DATA 43 11 1 Dir...

Page 4: ...e unit The units can also be lifted with slings using only the designated lifting points marked on the unit These units are not designed to be lifted from above Use slings with the correct capacity an...

Page 5: ...d documentation supplied with the products These units are intended to be stored and operated in an environment where the ambient temperature must be not less than the lowest allowable temperature ind...

Page 6: ...option 231 are equipped with capacitor batteries with a discharge time of five 5 minutes after disconnecting the power After disconnecting the power to the control box wait five minutes before opening...

Page 7: ...ny spills from the skin with soap and water If liquid refrigerant enters the eyes immediately and abundantly flush the eyes with water and consult a doctor The accidental releases of the refrigerant d...

Page 8: ...replacement Consult the list of replacement parts that corresponds to the specification of the original equipment Do not drain water circuits containing industrial brines without informing the technic...

Page 9: ...ever push or lever on any of the enclosure panels of the unit Only the base of the unit frame is designed to withstand such stresses If a unit includes a hydronic module options 116B C F G the hydroni...

Page 10: ...nit For options 5 6 100A 100C 107 refer to the certified drawing Air outlet do not obstruct Power supply and control connection Control circuit connection for option 158 NOTES Drawings are not contrac...

Page 11: ...ions 5 6 100A 100C 107 refer to the certified drawing Air outlet do not obstruct Power supply and control connection Control circuit connection for option 158 NOTES Drawings are not contractually bind...

Page 12: ...ons 5 6 100A 100C 107 refer to the certified drawing Air outlet do not obstruct Power supply and control connection Control circuit connection for option 158 NOTES Drawings are not contractually bindi...

Page 13: ...C NOTES Drawings are not contractually binding Before designing an installation consult the certified dimensional drawings available on request For the positioning of the fixing points weight distrib...

Page 14: ...ler installation and 3 13 Distance to the wall of this document to determine the space required 3 9 30XA 1402 1502 module 2 2 MCHE heat exchanger standard and 30XA 1402 1502 module 2 2 Cu Al heat exch...

Page 15: ...or option 158 NOTES Drawings are not contractually binding Before designing an installation consult the certified dimensional drawings available on request For the positioning of the fixing points wei...

Page 16: ...t your Carrier distributor to evaluate the various possible arrangements In certain situations an accessory supplied loose at the time of purchase can be added 3 13 Distance to the wall To ensure corr...

Page 17: ...8 20 8 20 8 23 5 23 5 23 5 23 5 23 5 23 5 Capacity control Touch Pilot electronic expansion valve EXV Minimum capacity 15 15 15 15 15 15 15 15 15 15 15 15 15 Condensers All aluminium microchannel heat...

Page 18: ...D kg 63 teqCO2 90 1 Oil charge Circuit A l 27 6 27 6 27 6 27 6 27 6 36 36 27 6 27 6 27 6 Circuit B l 27 6 27 6 27 6 36 36 36 36 27 6 27 6 23 5 Circuit C l 27 6 27 6 27 6 Circuit D l 23 5 Capacity con...

Page 19: ...5 23 5 23 5 23 5 23 5 27 6 Circuit C l Circuit D l Capacity control Touch Pilot electronic expansion valve EXV Minimum capacity 15 15 15 15 15 15 15 15 15 15 15 15 Condensers Copper aluminium coil Fa...

Page 20: ...screw compressors 50 r s Circuit A 1 1 1 1 1 1 1 1 Circuit B 1 1 1 1 1 1 1 1 Circuit C 1 1 1 Circuit D 1 Oil charge Circuit A l 27 6 27 6 36 36 36 27 6 27 6 27 6 Circuit B l 27 6 36 36 36 36 27 6 27...

Page 21: ...3 1039 1103 1118 1125 1143 Cosine Phi maximum 0 86 0 87 0 86 0 87 0 87 0 87 0 86 0 87 0 87 Cosine Phi nominal 0 85 0 85 0 85 0 86 0 87 0 87 0 86 0 85 0 85 Maximum power input Circuit 1 kW 359 420 182...

Page 22: ...60 Circuit 2 A 772 772 772 772 587 587 760 Option 81 A 1031 1047 1113 1128 1122 1133 Cosine Phi maximum 0 85 0 85 0 86 0 86 0 87 0 87 0 87 0 86 0 86 0 86 Cosine Phi nominal 0 84 0 84 0 84 0 84 0 84 0...

Page 23: ...772 772 845 865 761 Circuit 2 A 772 772 772 772 587 587 761 Option 81 A 1023 1039 1103 1118 1125 1143 Cosine Phi maximum 0 87 0 86 0 87 0 87 0 87 0 86 0 87 0 87 Cosine Phi nominal 0 85 0 85 0 86 0 87...

Page 24: ...t 1 A 860 587 587 772 772 845 860 760 Circuit 2 A 772 772 772 772 587 587 760 Option 81 A 1031 1047 1113 1128 1122 1133 Cosine Phi maximum 0 86 0 86 0 87 0 87 0 87 0 86 0 86 0 86 Cosine Phi nominal 0...

Page 25: ...characteristics used for the operation of the machines 1 Environment Environment as classified in EN 60364 corresponds to IEC 60364 Outdoor installation Ambient temperature range from 20 C to 55 C Alt...

Page 26: ...at full load and nominal voltage 86 1 88 6 88 6 90 1 91 3 91 3 1 Nominal efficiency at 75 rated load and nominal voltage 86 3 88 5 88 5 89 7 91 4 91 4 1 Nominal efficiency at 50 rated load and nominal...

Page 27: ...lator switch are designed for the number and type of wires listed in column 2 of the table on the next page The calculations are based on the maximum machine current see electrical data tables The cal...

Page 28: ...LPE Cu 904 2 x 240 2 x 185 205 XLPE Cu Not compatible 902 2 x 240 2 x 185 205 XLPE Cu Not compatible 1002 4 x 300 2 x 240 205 XLPE Cu 4 x 185 320 XLPE Cu Circuits A and B C common routing 1112 2 x 240...

Page 29: ...culated as shown in the diagram For minimum chilled water flow rate 1 Evaporator 2 Recirculation 6 3 Maximum chilled water flow units without hydronic module The maximum chilled water flow is shown in...

Page 30: ...buffer tank Bad Bad Good Good 6 6 Maximum system water volume Units with hydronic module incorporate an expansion tank that limits the water volume The table below gives the maximum loop volume for pu...

Page 31: ...1 702 2 752 3 802 4 854 852 5 904 902 6 1002 7 1112 8 1212 9 1312 10 1382 11 1402 12 1502 13 1702 Water flow rate l s Pressure drop kPa 1 2 4 5 6 9 8 10 3 7 11 13 12 100 100 10 10 10 100 10 252 302 35...

Page 32: ...ible with the materials and the water circuit coating The use of different metals on hydraulic piping could generate eletrolytic pairs and consequently corrosion Verify then the need to install sacrif...

Page 33: ...tions 5 6 and 100A Nominal diameter in 5 6 6 6 6 6 8 5 8 5 6 6 Actual outside diameter mm 141 168 3 168 3 168 3 168 3 168 3 219 1 141 3 219 1 141 3 168 3 168 3 Option 100C Nominal diameter in 6 8 Actu...

Page 34: ...re of 10 K below the lowest temperature likely to occur at the installation site If the unit is not used for an extended period it is recommended to drain it and as a safety precaution add ethylene gl...

Page 35: ...required kPa abs Water flow rate l s 7 7 2 Net positive suction head NPSH required hydronic module option Size the hydronic circuit to ensure a net positive suction head that is higher than or equal...

Page 36: ...separator 5 Principal electronic expansion valve EXV 6 Pressure and temperature measurement to calculate the sub cooling upstream of the pump 7 Motorised two way bypass valve 8 Free cooling expansion...

Page 37: ...nit The sealing joints are in the control box The temperature sensors and the condenser flow switch are wired and fixed in the machine They must be installed as described in the chapter Condenser wate...

Page 38: ...eight distribution and centre of gravity coordinates please refer to the dimensional drawings If the installation includes several units or if this these is are close to walls please refer to chapters...

Page 39: ...weight distribution and centre of gravity coordinates please refer to the dimensional drawings If the installation includes several units or if this these is are close to walls please refer to chapte...

Page 40: ...and centre of gravity coordinates please refer to the dimensional drawings If the installation includes several units or if this these is are close to walls please refer to chapters 3 11 Multiple chi...

Page 41: ...enser Legend 1 Heat reclaim condenser 2 Entering water temperature sensor supplied 3 Leaving water temperature sensor supplied 4 Condenser water flow switch supplied 5 Three way valve not supplied 9 4...

Page 42: ...om heat exchange at the air condenser to heat exchange at the water condenser and vice versa is ensured by motorised two way valves located upstream of the air and water condensers Setpoint C Condense...

Page 43: ...eral Monitoring during operation re qualification re testing and re testing dispensation Follow the regulations on monitoring pressurised equipment It is normally required that the user or operator se...

Page 44: ...oling of the rest of the flow that penetrates the evaporator via the prin cipal EXV This permits increasing the cooling capacity of the system as well as its efficiency 11 3 High pressure safety switc...

Page 45: ...on the compressor economiser discharge and suction lines ATTENTION The compressor suction valve must be used without pressure difference at the terminals If there is a pressure difference leak tightne...

Page 46: ...702 904 1 1 1 4 1 5 1 2 1 3 1 6 2 3 2 6 2 2 2 5 2 1 2 4 1 1 1 5 1 6 1 2 1 3 1 7 1 4 1 8 2 6 2 2 2 5 2 1 2 4 2 3 30XA 1112 1 1 1 5 1 6 1 2 1 3 1 7 1 4 1 8 2 7 2 5 2 8 2 4 2 7 2 5 2 3 2 2 2 6 2 1 2 6 3...

Page 47: ...pplementary water outlet temperature sensor kit to be field installed allowing master slave operation of two units connected in parallel Optimised operation of two chillers connected in parallel with...

Page 48: ...insulation of the evaporator entering leaving refrigerant lines with flexible anti UV insulant Prevents condensation on the evaporator entering leaving refrigerant lines 252 1702 Low noise level 257 S...

Page 49: ...ntion on the refrigerant circuit handling refrigerant Changing of parameters set at the factory application change Removal or dismantling of the HVAC unit Any intervention due to a missed established...

Page 50: ...l 6 1 Torque application to tighten the lug 2 Avoid contact between the two nuts 3 Lug tightening nut 4 Flat lug 5 Counter nut 6 Terminal tightening nut 7 Isolator 13 5 Tightening torques for the main...

Page 51: ...the coil surface or wedged between the chassis and the supports Provide personal protection equipment including safety glasses and or a face mask waterproof clothing and safety gloves It is recommend...

Page 52: ...sure drop across the filter can be determined by measuring the pressure at the filter service port and the oil pressure port The difference in these two pressures will be the pressure drop across the...

Page 53: ...g has been sized and installed properly Unit ground wire has been connected Electrical circuit protection has been sized and installed properly All terminals are tight All chilled water valves are ope...

Page 54: ...he chiller is not switched on until corrective measures have been taken Check cooler water loop Water loop volume litres Calculated volume litres 3 25 litres nominal kW capacity for air conditioning 6...