background image

24ABB3

Base

t

Series Air Conditioner with Puron

r

1---1/2 to 5 Nominal Tons

Single and Three Phase

Wiring Diagrams

NOTES:

1.  Symbols are electrical representation only.
2.  Compressor and fan motor furnished with inherent thermal protection.
3.  To be wired in accordance with National Electric N.E.C. and local codes.
4.  N.E.C. class 2, 24 V circuit, min.  40 VA required, 60 VA on units installed with LLS.
5.  Use copper conductors only.  Use conductors suitable for at least 75ºC (167ºF).
6.  Connection for typical cooling only thermostat. For other arrangements see installation instructions.
7.  If indoor section has a transformer with a grounded secondary, connect the grounded 
     side to the BRN/YEL lead.
8.  When start relay and start capacitor are installed, start thermistor is not used.
9.  CH not used on all units.
10.  If any of the original wire, as supplied must   be replaced, use the same or equivalent wire.
11.  Check all electrical connections inside control box for tightness.
12.  Do not attempt to operate unit until service valves have been opened.
13.  Do not rapid cycle compressor.  Compressor must be off 3 minutes to allow pressures to equalize 
       between high and low side before starting.
14.  Wire not present if HPS, LPS or CTD are used.

CONNECTION DIAGRAM

1.  Compressor damage may occur if system is over charged.
2.  This unit is factory charged with R-410A in accordance with 
      the amount shown on the rating plate.  The charge is 
      adequate for most systems using matched coils and tubing 
      not over 15 feet long.  Check refrigerant charge for maximum
      efficiency.  See Product Data Literature for required Indoor 
      air Flow Rates and for use of line lengths over 15 feet.
3.  Relieve pressure and recover all refrigerant before system 
      repair or final disposal.  Use all service ports and open all 
      flow-control devices, including solenoid valves.
4.  Never vent refrigerant to atmosphere.  Use approved 
     recovery equipment.

330440-101 REV. F

 * MAY BE FACTORY INSTALLED

LEGEND

FACTORY POWER WIRING

FACTORY CONTROL WIRING

FIELD CONTROL WIRING

FIELD POWER WIRING

COMPONENT CONNECTION

FIELD SPLICE

JUNCTION

CONT

CAP

*CH

*CHS

COMP

*CTD
*DTS
*HPS

IFR

*LLS

*LPS
OFM

*SC
*SR

*ST

CONTACTOR
CAPACITOR (DUAL RUN)
CRANKCASE HEATER
CRANKCASE HEATER SWITCH
COMPRESSOR
COMPRESSOR TIME DELAY
DISCHARGE TEMP SWITCH
HIGH PRESSURE SWITCH
INDOOR FAN RELAY
LIQ LINE SOLENOID VALVE
LOW PRESSURE SWITCH
OUTDOOR FAN MOTOR
START CAPICATOR
START RELAY
START THERMISTOR

CAUTION

BLK

or

RED

*CH

RED or BLK

BLK

YEL

YEL

COMP

BLK

BLU

CAP

YEL

BLU

BLU

YEL

*ST

BRN

*SR

OFM

BRN

BRN/YEL

BLK

BLK

208/230 1Ø

POWER

SUPPLY

GND

EQUIP

+t

L1

L2

H

C

F

YEL

VIO

YEL/ BLU

(NOTE #14)

(NOTE #9)

(NOTE #8)

INDOOR BLOWER MOTOR

EXTERNAL

POWER

SUPPLY

24 V

(NOTE #3)

INDOOR THERMOSTAT  (NOTE #6)

R

G

Y

*LLS

BLK

BLK

1

2

5

S

C

R

C
R

*SC

*CHS

BLK

*LPS

*DTS

BLK

BLK

*CTD

LOGIC

T1

T3

T2

YEL/PNK

BLU/PNK

BLK

YEL/ BLU

BRN/YEL

*HPS

YEL/PNK

BLU/PNK

CONT

11

21

23

23

SCHEMATIC DIAGRAM (LADDER FORM)

L1

*SR

*SC

H

COMP

*ST

C
F

CAP

OFM

L2

5

2

1

*LPS

* CTD

*DTS

*LLS

IFR

THERMOSTAT

INDOOR

Y

G

R

C

R

EXTERNAL POWER SUPPLY 24 V

(NOTE #14)

+t

LOGIC

T1

T3

T2

CONT

S

C

R

*HPS

EQUIP

GND

*CH

*CHS

11

21

CONT

CONT

23

23

COOLING ONLY 

CHARGING PROCEDURE

1.  Only use sub cooling charging method
     when OD ambient is greater than 70ºF 
     and less than 100ºF, indoor temp is 
     greater than 70ºF and less than 80ºF, and 
     line set is less than 80 ft.
2.  Operate unit a minimum of 15 minutes before 
     checking the charge.
3.  Measure liquid service valve pressure by 
     attaching an accurate gauge to the 
     service port.
4.  Measure the liquid line temperature by 
     attaching an accurate thermistor type or 
     electronic thermometer to the liquid line 
     near the outdoor coil.
5.  Refer to unit rating plate for required 
     subcooling temperature.
6.  Find the point where the required subcooling
     temperature intersects the measured liquid 
     service valve pressure.
7.  To obtain the required subcooling temperature 
     at specific liquid line pressure, add refrigerant 
     if liquid line temperature is higher than indicated. 
     When adding refrigerant, charge in liquid form 
     using a flow restricting device into suction 
     service port.  Recover refrigerant if temperature 
     is lower. Allow a tolerance of +/- 3ºF.

CONDENSING UNIT CHARGING INSTRUCTIONS

For use with units using R-410A refrigerant

REQUIRED LIQUID LINE TEMPERATURE

Required Subcooling

Temperature  (ºF)

Liquid Pressure

at Service

Valve (psig)

6

8

10 12 14 16

251

259
266
274
283
291
299

308
317
326
335
345
354
364
374

76

74

72

70

68

78

76

74

72

70

80

78

76

74

72

82

80

78

76

74

84

82

80

78

76

86

84

82

80

78

88

86

84

82

80

90

88

86

84

82

92

90

88

86

84

94

92

90

88

86

96

94

92

90

88

98

96

94

92

90

100

98

96

94

92

102 100

98

96

94

104 102 100

98

96

384
395

406
416
427
439
450

462

474

106 104 102 100

98

108 106 104 102 100

110 108 106 104 102
112 110 108 106 104
114 112 110 108 106
116 114 112 110 108
118 116 114 112 110

120 118 116 114 112

122 120 118 116 114

78

80
82
84
86
88
90

92
94
96
98

100
102
104
106

108
110

112
114
116
118
120

122

124

Fig. 1 – Wiring Diagram — Model sizes 1--1/2 -- 5 tons, 208/230--1

Reviews: