PRELIMINARY RELEASE
*** This is a confidential document. Do not distribute. ***
on and/or wait
assistance.
OE injector
ection
t
son Support.
Turn to Page 18 for more information about the Operation and Management Center (OMC).
If your find incorrect latitude and longitude information, contact Carlson Support or your
spectrum database manager for correction.
Close the “Basestation Details” window.
2.9.5.
Verifying Cell Control
At the top of the page, click the “Cell Control” tab.
Select the tab shown for your Basestation. Both the Basestation and its active CPEs will appear.
Figure 14: Cell Control Tab
Figure 15: Cell Control - Basestation & CPEs
If the Basestation and CPEs do not appear, troubleshoot the Internet connecti
another 3-5 minutes. If they fail to appear, contact Carlson Support for technical
Using a standard Ethernet cable (not supplied), connect a PC to the “IN” port of the P
connected to the first CPE.
Open a web browser and navigate to a webpage of your choice. A successful conn
verifies the operational status of the link.
ur Internet connection and/or wai
If you are unable to browse to a website, troubleshoot yo
another 3-5 minutes. If you need assistance, contact Carl
Repeat link verification steps for remaining CPE unit(s).
Once you have verified the operational status of every unit, congratulations! You have
completed the first step in testing your new RuralConnect system.
Page | 14