Initial System Setup
System Wet Tests
Do these procedures to make sure that the soft boom and nozzle valves are operating correctly.
Boom Shutoff Wet Test
1.
Fill the sprayer with approximately 400 gallons of water.
2.
Make sure that the VT display and rate controller are off.
3.
Start the machine engine and set to idle speed.
4.
Turn on the VT display and rate controller.
Figure 24:
5.
Select the box (1) below speed (2).
6.
Set a test speed (3).
7.
Select the box (4) below rate (5).
8.
Select M (6) and then use the arrow icons (7) to change the rate.
9.
Select the box (8) below pressure.
10. Select M (9) and then use the arrow icons (10) to change the pressure.
11. Select the box (11) below System.
12. Select the box (12) next to Pump (13) until ON shows.
13. Make sure that the system is controlling the pressure.
14. Turn on all of the boom switches.
All of the nozzle valves on the boom should start to spray.
15. Turn off all of the boom sections.
©
2021 Capstan Ag Systems, Inc.
34
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......