Troubleshooting
Interchange the Components
The system includes a number of multiple parts:
•
Nozzle Valves
•
Extension Harnesses
•
VCMs
When troubleshooting failed components, it can be helpful to replace the failed part with a working
part at another location. If the problem follows the failed part to the new location, repair or replace the
failed part.
When troubleshooting a failed VCM, a location setup procedure is necessary to show the VCM in the
correct location.
If the problem does not follow the failed part, then the problem is likely elsewhere in the system, and
other troubleshooting means may be followed.
Note: Use caution when failed parts are interchanged with a part that is operating correctly; in rare
cases, the failed component may cause other components to fail at the new location.
Coil Assembly Test
Use a voltmeter to measure the ohms of resistance across pins A and B on the coil connector.
Notice: Correct resistance is:
•
7-watt coils resistance—21 ohms to 23.5 ohms
•
12-watt coils resistance—10 ohms to 11.5 ohms
If correct resistance is not found:
•
Clean the connector terminals and retest
•
Replace the coil assembly
Coil assembly failures are often the result of two factors:
•
Extended valve use with a plugged nozzle
•
Extended use in corrosive environments
Recommendation: Clean any plugged valve assemblies immediately.
Recommendation: Rinse the inside of the booms, and wash the outside of the coil assemblies with
clean water as often as practical.
©
2021 Capstan Ag Systems, Inc.
107
PinPoint
™
III ENVELOP
Summary of Contents for PinPoint III ENVELOP
Page 6: ......
Page 65: ...TM Operation 2021 Capstan Ag Systems Inc 65 PinPoint III ENVELOP...
Page 66: ...TM Operation Nozzle Spacing 50 cm 2021 Capstan Ag Systems Inc 66 PinPoint III ENVELOP...
Page 67: ...TM Operation 2021 Capstan Ag Systems Inc 67 PinPoint III ENVELOP...
Page 69: ...TM Operation 2021 Capstan Ag Systems Inc 69 PinPoint III ENVELOP...
Page 71: ...TM Operation 2021 Capstan Ag Systems Inc 71 PinPoint III ENVELOP...
Page 72: ...TM Operation Nozzle Spacing 20 in 2021 Capstan Ag Systems Inc 72 PinPoint III ENVELOP...
Page 73: ...TM Operation 2021 Capstan Ag Systems Inc 73 PinPoint III ENVELOP...
Page 75: ...TM Operation 2021 Capstan Ag Systems Inc 75 PinPoint III ENVELOP...
Page 76: ...TM Operation 2021 Capstan Ag Systems Inc 76 PinPoint III ENVELOP...
Page 84: ...TM Maintenance 2021 Capstan Ag Systems Inc 84 PinPoint III ENVELOP...
Page 116: ...TM Troubleshooting 2021 Capstan Ag Systems Inc 116 PinPoint III ENVELOP...
Page 122: ...TM Schematics System Layout Figure 42 2021 Capstan Ag Systems Inc 122 PinPoint III ENVELOP...
Page 124: ...TM Schematics 2021 Capstan Ag Systems Inc 124 PinPoint III ENVELOP...
Page 127: ......