System issue/status
LED Warning code
Recommended action
The battery has run out of capacity.
The system has triggered the lowest level of voltage protection.
Start to charge the battery.
The battery has triggered high or low temperature protection.
Move the battery to a location with
a temperature of 5 ~ 40 °C.
The battery has triggered short circuit protection.
Remove external object causing short circuit
for 30 sec.
The battery has triggered permanent failure protection or further
safety measures.
Stop charging and contact the place of
purchase or a bicycle dealer.
After long term use, it may flash like this for 10 seconds during
charging.
Stop charging and contact the place of
purchase or a bicycle dealer.
Constant light
Off
Flashing, 2 Hz
Flashing, 1 Hz
45
TROUBLESHOOTING
Summary of Contents for TORQUE:ON CF M124
Page 9: ...2x 2x 9 1 UNPACKING 1 3 1 2 1 1 1 5 1 6 1 4...
Page 10: ...10 2 WHEEL ASSEMBLY X 2 X 3 X 1 X 4 2 3 2 2 2 1 2 4...
Page 11: ...FOR PEDALS GREASE OIL KEEP BRAKE SYSTEM CLEAN 11 2 WHEEL ASSEMBLY 2 8 2 9 2 7 2 5 2 6...
Page 12: ...6 Nm 4 mm 4 mm NO GAP GAP 12 3 HANDLEBAR INSTALLATION ST31 X 2 X 3 X 1 3 3 3 1 3 2 3 5 3 4...
Page 14: ...4 mm 4 mm 2 Nm 4 mm 14 COCKPIT HEIGHT ADJUSTMENT OPTIONAL 2 3 4 1...
Page 15: ...6 Nm 4 mm 15 COCKPIT HEIGHT ADJUSTMENT OPTIONAL X 2 5...
Page 18: ...4 mm 18 7 SEATPOST ADJUSTMENT 7 3 7 2 7 1...
Page 20: ...Nm m a x m i n 0 to 5 20 8 SADDLE ADJUSTMENT 8 2 8 3 8 1...
Page 22: ...22 10 TIRE PRESSURE...
Page 23: ...23 11 DISCONNECTING BATTERY CHARGING X 2 X 3 X 1 13 1 11 1 11 3 11 2...
Page 24: ...1 5 SEC BATTERY MANUAL 10 40 C 0 40 C 0 C 24 11 DISCONNECTING BATTERY CHARGING...
Page 25: ...1 5 SEC 25 12 CONNECTING BATTERY SWITCHING BIKE ON OFF X 2 X 3 X 1 12 2 12 3 12 1...
Page 39: ...YOUR BIKE S NOW PROPERLY MAINTAINED 39 MAINTENANCE...
Page 40: ...SRAM Shimano 40 DISSASSEMBLY REAR WHEEL 2 3 1 4...
Page 41: ...15 Nm SRAM Shimano 41 ASSEMBLY REAR WHEEL 2 3 1...
Page 42: ...42 BEFORE REMOVING BATTERY OPTIONAL 4 2 3 1...
Page 43: ...1 2 3 1 2 43 REMOVE BATTERY OPTIONAL 5 4 2 3 1...
Page 44: ...1 2 3 8 Nm 44 INSTALL BATTERY OPTIONAL 5 6 4 2 3 1...
Page 48: ...48...
Page 49: ...49...
Page 50: ...50...
Page 51: ...READY TO RIDE CANYON SUPPORT CENTRE FOR UNBOXING AND ASSEMBLING SCAN HERE 51...