6
6
6-38
6-38
Installation > Machine Relocation Work
Installation > Machine Relocation Work
Machine Relocation Work
When relocating the finisher to other place, carry out the following work.
1) Turn off the host machine, and then disconnect the power plug
(from the outlet).
2) Disconnect the interface cable from the host machine.
3) When the optional machine (the professional puncher, the
document insertion unit, the paper folding unit) has been
installed, remove the PCB cover and then disconnect the
optional connector from the finisher controller PCB and remove
the cable fixing plate to remove the interface cable of the
optional machine from the harness guide.
4) Disconnect the shunt cable.
5) When the power cord of the optional machine has been
connected to the finisher, remove the plug cover to disconnect
the power cord.
6) Open the front cover of the finisher.
<Staple Finisher-D1>
<Booklet Finisher-D1>
F-6-92
F-6-92
F-6-93
F-6-93
7) For Staple Finisher-D1, remove two screws to remove the latch cover.
x2
F-6-94
F-6-94
Summary of Contents for Staple Finisher-D1
Page 4: ...0 0 0 4 0 4 ...
Page 9: ...Safety Precautions Notes Before it Works Servicing ...
Page 59: ...3 3 Periodic Servicing Periodic Servicing List of Work for Scheduled Servicing ...
Page 144: ...5 5 Adjustment Adjustment Overview Basic Adjustment Action on parts replacement ...
Page 194: ...7 7 Appendix Appendix Service Tools General Circuit Diagram F 7 1 F 7 1 ...