• Binding position
- Rear 1-point binding (30 deg)
7
.8
±
2
.0
mm
13.5 ± 2.0 mm
3.0 mm or less
Delivery direction
Saddle Stitcher Unit (Booklet Finisher)
Item
Specifications
Remarks
Stacking orien-
tation
Fixed folding stack tray
Stapling meth-
od
Vertically separated, semi-flat clinch, stapling at two positions in the middle
Folding meth-
od
Roller pressure 2-fold
Fold position
Center folding
Fold position
Feed direction: 270 to 457.2 mm
Cross feed direction: 195 to 304.8 mm
A3, B4, A4R, 12X18, 11X17, LGL, LTRR
Paper weight
Body page: 52 to 220 g/m2
Cover page: 52 to 256 g/m2
- Paper weight of the
cover page should
be more than paper
weight of the body
page.
Capacity
Without stitch
- 52 to 105 g/m2: 1 to 3 sheets
- More than 105 to 256 g/m2: 1 sheet
With stitch
- 52 to 81.4 g/m2: 2 to 20 sheets
- More than 81.4 to 105 g/m2: 2 to 10 sheets
- More than 105 to 150 g/m2: 2 to 5 sheets
- More than 150 to 209 g/m2: 2 to 4 sheets
- More than 209 to 220 g/m2: 2 or 3 sheets
- Includes one cover
page.
Stackable pa-
per
Thin, plain, recycled, environmental, heavy, coated paper
Stacking ca-
pacity
Without stitch
- 52 to 105 g/m2: 25 sets
- More than 105 to 256 g/m2: 10 sets
With stitch, without cover
52 to 81.4 g/m2
2 to 5 sheets: 25 sets
6 to 10 sheets: 15 sets
11 to 20 sheets: 10 sets
- With cover, up to 10
sets.
More than 81.4 to 105
g/m2
2 to 5 sheets: 25 sets
6 to 10 sheets: 15 sets
More than 105 to 220
g/m2
10 sets
Staple supply
Special staple cartridge (2,000 staples)
Staple supply
Available
1. Product Overview
11
Summary of Contents for Staple Finisher-AA1
Page 1: ...Revision 4 0 Staple Finisher AA1 Booklet Finisher AA1 Service Manual ...
Page 12: ...Product Overview 1 Features 5 Specifications 6 Names of Parts 14 Optional Configuration 20 ...
Page 83: ...Periodical Service 3 Periodic Servicing Tasks 76 ...
Page 87: ...3 Remove the 2 Connectors 1 2x 1 4 Parts Replacement and Cleaning 79 ...
Page 89: ...Main Units Parts 4 5 6 7 8 1 2 3 4 Parts Replacement and Cleaning 81 ...
Page 128: ...4x 1 2 2 3 3 2x 4 Parts Replacement and Cleaning 120 ...
Page 150: ...Adjustment 5 Overview 143 Basic Adjustment 148 Adjustments When Replacing Parts 173 Other 184 ...
Page 193: ...Troubleshooting 6 Making Initial Checks 186 Processing Tray Area 187 Saddle Stitcher Area 188 ...
Page 204: ...4 5 6 7 8 9 7 Installation 196 ...
Page 205: ...10 7 Installation 197 ...
Page 223: ...2 3 2x 7 Installation 215 ...
Page 224: ...APPENDICES Service Tools 217 General Circuit Diagram 218 ...