
Chapter 2
2-2
2.2.2 Power-On Sequence
0019-9508
The sequences from the power-ON to the STBY period are described below.
1) Power-ON
2) CPU initialization
3) Video interface communication start
4) Residual paper check
Detecting paper presence by each sensor signaling.
5) Initial drive for main motor
6) Initial drive for fixing heater
Controlling fixing temperature targeting for 120 deg C.
7) Initial drive of the scanner motor.
8) High-voltage control
Detect cartridge presence after primary charging AC bias is applied.
Cleaning transfer roller.
9) Failure/Abnormality check
Detecting fixing unit failure and door open during above periods.
Summary of Contents for LBP3250 Series
Page 1: ...Aug 13 2008 Service Manual LBP3250 Series LBP3250 ...
Page 9: ...Chapter 1 PRODUCT DESCRIPTION ...
Page 17: ...Chapter 2 TECHNICAL REFERENCE ...
Page 45: ...Chapter 3 DISASSEMBLY AND ASSEMBLY ...
Page 66: ...Chapter 3 3 19 F 3 67 1 1 2 ...
Page 67: ...Chapter 4 MAINTENANCE AND INSPECTION ...
Page 71: ...Chapter 5 TROUBLESHOOTING ...
Page 77: ...Chapter 6 APPENDIX ...
Page 82: ...Aug 13 2008 PARTS CATALOG LBP3250 ...
Page 88: ...2 2 FIGURE 100 EXTERNAL COVERS PANELS ETC 1 2 4 6 9 10 7 8 5 11 3 ...
Page 90: ...2 4 FIGURE 101 INTERNAL COMPONENTS 1 SEE FIGURE 810 2 3 1 ...
Page 92: ...2 6 FIGURE 102 INTERNAL COMPONENTS 2 2 5 3 1 4 ...
Page 94: ...2 8 FIGURE 103 INTERNAL COMPONENTS 3 1 2 4 3 ...
Page 96: ...2 10 FIGURE 810 FIXING PAPER DELIVERY ASS Y 1 2 3 3 ...
Page 98: ......