7
7
7-34
7-34
Installation > Adjustment > Height Adjustment > Checking the Height
Installation > Adjustment > Height Adjustment > Checking the Height
Checking Connection
1) Input connection step of Finisher.
• Service mode > COPIER > OPTION > ACCPST-D > ACC1 to 8
NOTE:
In the case of directly connecting to the host machine, enter "1" and press "OK".
2) Exit from Service Mode.
3) Execute shutdown sequence, and then turn OFF the power of the host machine and
Finisher.
4) Turn ON the power of the finisher then the host machine.
CAUTION:
The host machine must be turned off and then back on after indicating the order of
connection; otherwise, it will not be able to recognize the presence of the connected
accessories.
5) Confirm that the combination of the firmware version for host machine and Finisher is
appropriate.
6) Check the paper feed and operation.
Adjustment
Height Adjustment
Depending on the floor condition of the installation site, the height of the Finisher needs to
be adjusted. If not properly adjusted, paper can be jammed more frequently in the Finisher
Pickup Assembly. Follow the steps below to adjust the height if necessary.
■
Checking the Height
1) Follow the instruction of shutdown sequence, and then turn OFF the power of the host
machine and Finisher.
2) Check the height of the Finisher and the upstream equipment.
The height difference between the right top of the Finisher and the left top of the upstream
equipment should be /-2 mm.
(The figure shows a case of connection with the host machine.)
Finisher
Host Machine
F-7-97
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...