7
7
7-3
7-3
Installation > Checking the Unpacking Space
Installation > Checking the Unpacking Space
Checking the Unpacking Space
Dimension described in the figure below indicates minimum space needed for installation
area. Thus, a space for installation work is desirable to be larger than what is described
below.
1) In the case of unpacking in the room, the following space is needed to unpack.
907mm
1021mm
1316mm
2776mm
1460mm
F-7-3
2) The following space is needed when the equipment is lifted down from pallet.
• Palette
• Slope
• Equipment
1021mm
914mm
2775mm
840mm
Palette
Slope
Equipment
F-7-4
Summary of Contents for Finisher-AK1
Page 8: ... Notes Before Servicing Points to Note at Cleaning Safety Precautions ...
Page 10: ...1 1 Product Outline Product Outline Product Specifications Names of Parts ...
Page 55: ...3 3 Periodic Servicing Periodic Servicing User Maintenance Maintenance and Inspection ...
Page 309: ...6 6 Troubleshooting Troubleshooting Upgrading ...
Page 361: ... Service Tools Solvents and Oils List of Signals General Circuit Diagram Appendix ...