4
4
4-9
4-9
Installation > Adjustments > Punching Operation Settings
Installation > Adjustments > Punching Operation Settings
Adjustments
Punching Operation Settings
NOTE:
Depending on the Punch Unit to install, you may need to make settings of the DIP
Switch on the switch PCB found in the Finisher.
1) Open the Front Cover to remove the Switch Cover.
• 1 Screw
Switch Cover
Screw
2) Specify the DIP Switch SW381 on the switch PCB as follows.
SW382
SW381
SW383
(-)
(+)
ENTER
SW384 SW385
DSP381
DIP Switch
SW381
F-4-18
F-4-19
ON
1 2 3 4 5 6 7 8
ON
1 2 3 4 5 6 7 8
punch unit not used
SW381
2/3-hole punch unit used
2/4-hole (French) punch unit used
4-hole (Sweden) punch unit used
3) Install the Switch Cover and close the Front Cover.
• 1 Screw
4) Turn ON the Power Switch of the Finisher, and then the Host Machine.
5) Specify the punching operation on the controlpanel of the Host Machine to confirm whether
to execute punching operation.
F-4-20