background image

 
 
 
 
 
 
 
 

 

 

 

165 HIM Series 

Softener Operation Manual 

 

 
 
 
 
 
 
 
 
 
 
 
 

Note: 
1.  Read all instructions carefully before operation. 
2.  Avoid pinched o-rings during installation by applying  
 

(provided with install kit) NSF certified lubricant to all seals. 

 

Rev 8, December 28 2011 

 

Summary of Contents for CAN165HIM-100

Page 1: ...ener Operation Manual Note 1 Read all instructions carefully before operation 2 Avoid pinched o rings during installation by applying provided with install kit NSF certified lubricant to all seals Rev...

Page 2: ...al Valve Installation 7 Start up Instructions 8 System Configuration 9 Maintenance 10 Power Head Valve Exploded View 12 Power Head Parts List 13 Control Valve Exploded View 14 Control Valve Parts List...

Page 3: ...5 1 5925 3925 2925 2325 1925 1639 1425 1258 1125 1016 925 848 782 725 2 5850 3850 2850 2250 1850 1564 1350 1183 1050 941 850 773 707 650 Number of 3 5775 3775 2775 2175 1775 1489 1275 1108 975 866 775...

Page 4: ...rvice it will read CANATURE while the valve returns to the service position Maximum Water Temperature 110 F 43 C Maximum Operating Pressure 100 PSIG 689 kPa Voltage 110 volts standard Pipe Size 3 4 At...

Page 5: ...nd press until you hear a beep to unlock the display screen Press or to select which setting to modify 2 To change setting press When the display flashes the value may be changed Press or to change th...

Page 6: ...e drain 10 BRINE This option controls the length if time in minutes for the unit to draw regenerant brine for softeners from the second tank and slowly rinse it from the top to bottom of the tank 11 R...

Page 7: ...that exceed 7 gpm or length that exceeds 20ft 6 m ON COPPER PLUMBING SYSTEMS BE SURE TO INSTALL A GROUNDING WIRE BETWEEN THE INLET AND OUTLET PIPING TO MAINTAIN GROUNDING 3 Any solder joints near the...

Page 8: ...ing the water on fully then allow water to run to drain for 3 4 minutes or until all media fines are washed out of the softener or filter 4 Press the to advance to the BRINE position Check the water l...

Page 9: ...0 GPM 10 3 2 4 GPM 12 4 3 5 GPM 13 6 4 0 GPM 14 7 5 0 GPM 16 none Suggested Softener Valve Configuration 000 Brown 0 70 GPM 1 1 5 GPM 1 White 2 Blue 3 Yellow Figure 9 Valve Configurations Automatic B...

Page 10: ...evel To add salt simply lift the salt lid and add the salt directly into the brine tank Be sure the brine well cover is on and fill only to the height of the brine well Bridging Humidity or wrong type...

Page 11: ...y Carefully remove the assembly and disassemble as shown in Figure 6 The injector orifice is removed from the valve body by carefully turning it out with a large screwdriver Remove the injector throat...

Page 12: ...12 Power Head Exploded View See parts listing on next page 13...

Page 13: ...w ST2 9 10 5 B16 5056504 Bnt165 Pcb 1 B17 5056500 Bnt165 Front Cover 1 5056505 Bnt165 Operation Label 1 5056506 Bnt165 Regen Label 1 B18 5056509 Screw ST2 9 10 CSK 2 B19 5056082 Screw M3 5 2 B20 50565...

Page 14: ...14 Control Valve Exploded View See parts listing on next page 15...

Page 15: ...C onnect or 1 A 26 13000426 S crew S T2 9 13 Large W af er 2 A 27 05056038 D rai n Fi t t i ng 1 A 28 26010003 O R i ng 18 2 65 1 A 29 05056036 D LFC B ut t on R et ai ner 1 A 30 05056079 O R i ng 15...

Page 16: ...egeneration frequency 3 Inlet of control plugged due to foreign material Remove piston and clean control valve 1 Air in water system Check well system for proper air eliminator control 2 Incorrect dra...

Page 17: ...17...

Page 18: ...proof of purchase or installation is provided and then the warranty period shall be from the date thereof Ten Year Guarantee on Mineral Tanks and Brine Tanks Canature North America Inc will provide a...

Reviews: