UPDATE SUMMARY
UPDATE SUMMARY
This summary highlights updates to the Predelivery Inspection for MY2014. It does not supersede pro-
cedures detailed further in this publication.
IMPORTANT:
Technicians should read and apply all procedures in this PDI bulletin as applicable to model.
APPLICABLE TO
UPDATE DESCRIPTION
REFERENCE
Uncrating method sequence modified
UNCRATING
Front cargo module installation sequence
additions, modifications and sequence changes
PARTS TO BE INSTALLED
Parts installation sequence additions and
modifications.
PARTS TO BE INSTALLED
New front and side panels (all except Brazil
models)
PARTS TO BE INSTALLED
NEW engine coolant
FLUIDS
ST Models
New low beam headlight adjustment (CE
models)
SETUP
PREDELIVERY
2014-3
3 / 41