
UT10 Universal Tower
11
FIGURE 7-5. UT10 mounting brace removal
4. Align the UT10 so the openings in the mounting feet are angled diagonally
away at a 60° angle. This allows a solar panel to be mounted across the
two tower legs facing the equator while allowing the tower to tilt away
from the equator for servicing.
Align the hole in the bottom of each mounting foot with one of the J-bolts
in the concrete base. Slide the UT10 onto the J-bolts.
Summary of Contents for UT10
Page 2: ......
Page 6: ......
Page 35: ...UT10 Universal Tower 25 FIGURE 8 9 SRM 5A Rad Modem and SC932A Interface ...
Page 36: ...UT10 Universal Tower 26 FIGURE 8 10 SRM 5A wiring Computer Datalogger ...
Page 50: ...UT10 Universal Tower 40 FIGURE 8 21 HMP60 Temperature and RH Probe HMP60 Mounting Clamp ...
Page 68: ...UT10 Universal Tower 58 ...
Page 69: ......