Section 8. Operation
340
than one hop away. Table
PakBus Link-Performance Gage
(p. 340)
provides a link-
performance gage.
Table 81.
PakBus Link-Performance Gage
500 byte
Pings Sent
Successes
Link Status
10 10
excellent
10 9 good
10 7-8
adequate
10 <7
marginal
8.5.4.3 Traffic Flow
Keep beacon intervals as long as possible with higher traffic (large numbers of
nodes and / or frequent data collection). Long beacon intervals minimize
collisions with other packets and resulting retries. The minimum recommended
Beacon Interval
setting is
60
seconds. If communications traffic is high, consider
setting beacon intervals of several minutes. If data throughput needs are great,
maximize data bandwidth by creating some branch routers, or by eliminating
beacons altogether and setting up neighbor filters.
8.5.5 LoggerNet Network-Map Configuration
As shown in figure
Flat Map
(p. 340)
and figure
Tree Map
(p. 340)
, the essential
element of a PakBus
®
network device map in
LoggerNet
is the
PakBusPort
. After
adding the root port (COM, IP, etc), add a PakBusPort and the dataloggers.
Figure 104: Flat Map
Figure 105: Tree Map
Summary of Contents for CR850
Page 2: ......
Page 4: ......
Page 6: ......
Page 26: ...Table of Contents 26...
Page 30: ...Section 2 Cautionary Statements 30...
Page 32: ...Section 3 Initial Inspection 32...
Page 35: ...Section 4 Quickstart Tutorial 35 Figure 2 Wiring panel...
Page 55: ...Section 4 Quickstart Tutorial 55 Figure 24 PC200W View data utility...
Page 78: ...Section 5 System Overview 78...
Page 80: ...Section 6 CR800 Specifications 80...
Page 267: ...Section 7 Installation 267 Figure 84 Running average signal attenuation...
Page 268: ...Section 7 Installation 268...
Page 384: ...Section 8 Operation 384 Figure 113 Using the keyboard display...
Page 387: ...Section 8 Operation 387 Figure 116 Real time custom...
Page 388: ...Section 8 Operation 388 8 8 1 3 Final Storage Tables Figure 117 Final storage tables...
Page 389: ...Section 8 Operation 389 8 8 2 Run Stop Program Figure 118 Run Stop Program...
Page 390: ...Section 8 Operation 390 8 8 3 File Display Figure 119 File display...
Page 396: ...Section 8 Operation 396...
Page 402: ...Section 9 Maintenance 402...
Page 450: ...Section 11 Glossary 450...
Page 504: ...Appendix A CRBasic Programming Instructions 504...
Page 526: ...Appendix B Status Table and Settings 526...
Page 530: ...Appendix C Serial Port Pinouts 530...
Page 536: ...Appendix E FP2 Data Format 536...
Page 550: ...Appendix F Other Campbell Scientific Products 550...
Page 565: ......