![Campbell CR6 Series Operator'S Manual Download Page 283](http://html.mh-extra.com/html/campbell/cr6-series/cr6-series_operators-manual_489096283.webp)
Section 7. Installation
283
4. Set
KnownVar
variable to the offset or zero value.
5.
Set mode variable =
1
to start calibration.
7.7.12.4.2 Two-Point Calibrations (gain and offset)
Use this two-point calibration procedure to adjust multipliers (slopes) and offsets
(y intercepts). See
FieldCal() Slope and Offset (Opt 2) Example
(p. 289)
and
FieldCal() Slope (Opt 3) Example
(p. 291)
for demonstration programs:
1. Use a separate
FieldCal()
instruction and separate variables for each sensor to
be calibrated.
2.
Ensure mode variable =
0
or
6
before starting.
a. If
Mode
>
0
and ≠
6
, calibration is in progress.
b. If
Mode
<
0
, calibration encountered an error.
3. Place sensor into first known point condition.
4. Set
KnownVar
variable to first known point.
5. Set
Mode
variable =
1
to start first part of calibration.
a.
Mode
=
2
(automatic) during the first point calibration.
b.
Mode
=
3
(automatic) when the first point is completed.
6. Place sensor into second known point condition.
7. Set
KnownVar
variable to second known point.
8. Set
Mode
=
4
to start second part of calibration.
a.
Mode
=
5
(automatic) during second point calibration.
b.
Mode
=
6
(automatic) when calibration is complete.
7.7.12.4.3 Zero Basis Point Calibration
Zero-basis calibration (
FieldCal()
instruction
Option 4
) is designed for use with
static vibrating wire measurements. It loads values into zero-point variables to
track conditions at the time of the zero calibration. See
FieldCal() Zero Basis
(Opt 4) Example
(p. 294)
for a demonstration program.
7.7.12.5 Field Calibration Examples
FieldCal()
has the following calibration options:
•
Zero
Summary of Contents for CR6 Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 32: ......
Page 36: ......
Page 38: ......
Page 76: ...Section 5 Overview 76 FIGURE 20 Half Bridge Wiring Example Wind Vane Potentiometer ...
Page 80: ...Section 5 Overview 80 FIGURE 23 Pulse Input Wiring Example Anemometer ...
Page 136: ......
Page 454: ...Section 8 Operation 454 FIGURE 104 Narrow Sweep High Noise ...
Page 459: ...Section 8 Operation 459 FIGURE 106 Vibrating Wire Sensor Calibration Report ...
Page 535: ...Section 8 Operation 535 8 11 2 Data Display FIGURE 121 CR1000KD Displaying Data ...
Page 537: ...Section 8 Operation 537 FIGURE 123 CR1000KD Real Time Custom ...
Page 538: ...Section 8 Operation 538 8 11 2 3 Final Storage Data FIGURE 124 CR1000KD Final Storage Data ...
Page 539: ...Section 8 Operation 539 8 11 3 Run Stop Program FIGURE 125 CR1000KD Run Stop Program ...
Page 541: ...Section 8 Operation 541 FIGURE 127 CR1000KD File Edit ...
Page 546: ......
Page 552: ......
Page 610: ...Section 11 Glossary 610 FIGURE 137 Relationships of Accuracy Precision and Resolution ...
Page 612: ......
Page 648: ......
Page 650: ......
Page 688: ......
Page 689: ......