
Appendix L. CPEC300 Series Pump Replacement
L-6
10.
Cut the blue (inlet) and red (outlet) tubing on each side of the pump
behind the barbed connector as shown in FIGURE
FIGURE L-10. Location of cuts to remove pump assembly from tubing
11.
Remove the pump from the assembly.
L.3 Installation
To reinstall a CPEC300 pump, carry out the following steps:
1.
Position the pump with the label up and connect the coiled tubing on
both sides of the pump (see FIGURE
). Blue tubing connects the
inlets and red connects the outlets as directional arrows show on the
side of the pump (FIGURE
FIGURE L-11. Inlet and outlet tubing reconnected to pump