background image

FT-153 Beaufort Fountain 

Professional installation is recommended for this fountain! Assemble your fountain on a level surface using crushed stone, gravel, or 

cement pad as the base. 

Revised April 23, 2018 

 

FT-114D (116 lbs) 

32”W x 9.5”H 

 

FT-115A (35 lbs) 

8”W x 17”H 

 

FT-114F (3 lbs) 

5.25”L x 2”W x 4”H 

 

FT-239L (8 lbs) 

8.25”L x 1.75”W x 6.5”H 

 

 

FT-124K (282 lbs each) 

38”L x 9”W x 15”H 

 
 

 

17.

 

Place a hose clamp over the top end of the tubing and connect that end of the 
tubing to the bottom of the middle bowl (FT-114D). Tighten the hose clamp to 
ensure a good seal. 

18.

 

Place the middle bowl down onto the middle pedestal. 
 
 
 
 
 
 

19.

 

Place the finial (FT-114A) in the small bowl by lowering the hole over the 
copper pipe protruding from the bowl. 
 
 
 
 
 
 
 

20.

 

Cover the middle pedestal pump access with the pump cover door (FT-114F). 
 
 
 
 
 
 
 
 
 

21.

 

Cover the pump access in the bottom base with the pump cover door (FT-124J). 
 
 
 
 
 
 

22.

 

Place 1 piece of coping (FT-124K) directly against the fiberglass basin (FGB-
2020). 

23.

 

Place 1 wood spacer against the bottom outer edge of the first piece of coping. 

a.

 

Leave about 1 inch of the spacer sticking out for easy removal. 

24.

 

Position the second coping against the wood spacer and basin. 

25.

 

Repeat steps 23 and 24 until only 1 piece of coping is not in place. There should 
be a gap between copings where the inside corners meet. 

26.

 

Insert 1 plastic wedge about 3 inches from each edge of the 7 copings already 
installed. (This reduces the gap in the inner circle of the coping.) 

27.

 

Carefully push the final piece of coping into place and place the 2 wedges under 

a.

 

Adjust the other copings as needed to form a circle. 

28.

 

Remove the wood spacers. 

29.

 

Fill the basin with water. 

Reviews: