![Cambium Networks PTP 820E Installation Manual Download Page 72](http://html.mh-extra.com/html/cambium-networks/ptp-820e/ptp-820e_installation-manual_485683072.webp)
Page 72 of 110
3.
When looking at a complete link the radios should be aligned in the same direction. This means the radios
face each other in a mirror image, as shown in the following figure.
Figure 26: Complete Link – V-45° Polarization at Local Site (Left), V+45° Polarization at Remote Site (Right)
Performing Antenna Alignment Using the Standard Alignment Kit
You can perform adjustments to the azimuth and elevation of the antenna by turning bolts on the pole mount.
Summary of Contents for PTP 820E
Page 1: ......
Page 44: ...Page 44 of 110 1 Secure the cable to the gland using a tie wrap ...
Page 47: ...Page 47 of 110 8 Tighten the gland cap 9 Secure the cable to the gland with a tie wrap ...
Page 53: ...Page 53 of 110 4 Tighten the gland cap 5 Secure the cable to the gland using a tie wrap ...
Page 63: ...Page 63 of 110 Note For this type of installation a 2RU space is required ...
Page 71: ...Page 71 of 110 Figure 24 V 45 Polarization B on Top Figure 25 Vertical Polarization ...