Chapter 10: Acceptance and Commissioning Procedures
PTP 820 Commissioning Log
Page 10-8
PTP 820 Commissioning Log
The Commissioning Log is an integral part of the commissioning procedure and should be filled in for
each installed link.
The Commissioning Log gathers all relevant information regarding the installed link and contains a
checklist of all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations, and to provide essential
data for Cambium Networks.
Upon completing the Commissioning Log, send the log to Cambium Networks’ support center at
https://support.cambiumnetworks.com
PTP 820 LINK COMMISSIONING LOG
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name & add:
Site 2 name & add:
2. ODU/RFU
Site 1
Site 2
ODU model:
ODU p/n:
ODU s/n:
ODU SW:
Tx frequency (MHz):
Rx frequency (MHz):
Link ID:
Tx power (dBm):
ATPC on/off:
ATPC ref level:
ODU Polarization:
3. ANTENNA AND ODU MOUNT
Site 1
Site 2
Antenna vendor and model:
Antenna size:
Mounting type:
Mounting losses:
4. LINK PARAMETERS
Site 1
Site 2