Installation Guide for RFU-D-HP
Page 30 of 179
Chapter 3
Grounding the RFU-D-HP
List of Items
Table 4: Grounding Cable
P/N
Description
Quantity
N000082L116A
PTP 820 GROUND CABLE FOR IDU and ODU
1
Required Tools
•
Metric offset wrench key wrench #3
•
Metric wrench 10mm
Procedure
1 On the front of each RFU-D-HP unit, loosen the nut, plain washer, and serrated washer from the GND
stud, using the metric offset hexagon key and the wrench.
2 Place the cable lug (supplied with the RFU-D-HP grounding kit) in place on the screw.
3 Secure the cable lug.
4 The second side of the GND cable should be connected to the main ground bar or terminal ground bar
of the site.
5 Perform a resistance test between the 2 lugs of the GND cable. Verify that the result is 0-2 ohms.
Note!
The unit’s earthing screw terminal shall be permanently connected to protective earth in a building
installation in accordance with applicable national code and regulations by a service person.
Any outdoor antenna cable shield shall be permanently connected to protective earth in a building
installation.
Summary of Contents for PTP 820 Series
Page 1: ...Installation Guide ...
Page 69: ...Installation Guide for RFU D HP Page 69 of 179 ...
Page 75: ...Installation Guide for RFU D HP Page 75 of 179 ...
Page 91: ...Installation Guide for RFU D HP Page 91 of 179 ...
Page 93: ...Installation Guide for RFU D HP Page 93 of 179 ...
Page 102: ...Installation Guide for RFU D HP Page 102 of 179 ...
Page 120: ...Installation Guide for RFU D HP Page 120 of 179 ...
Page 143: ...Installation Guide for RFU D HP Page 143 of 179 1 4 2 5 3 OCU ...