Installing a Connectorized Radio 

Cambium recommends to assemble the antenna and connectorized device prior to field deployment. To install 
the connectorized radio, GPS antenna, and cabling, proceed as follows: 

1  Depress the retaining clip, then remove the bottom cover of the connectorized device. 

 

 

2  Remove the knockouts from the bottom shell cover for GPS, Ethernet, and grounding cable routing.  

Remove any remaining plastic burrs which may damage cabling. 

             

 

3  With a Philips screwdriver, remove the GPS cover (2 screws), radio protective cover and radio mounting 

bracket (4 screws) to prepare the antenna for GPS antenna mounting 

               

       

 

Summary of Contents for ePMP

Page 1: ...System Release 1 0 Safety and Installation Considerations Installing a Connectorized Radio Installing an Integrated Radio Antenna Installation Device LEDs Site Diagrams Installation Guide ...

Page 2: ...ks of the copyrighted material Accordingly any copyrighted material of Cambium Networks its licensors or the 3rd Party software supplied material contained in the Cambium Networks products described in this document may not be copied reproduced reverse engineered distributed merged or modified in any manner without the express written permission of Cambium Networks Furthermore the purchase of Camb...

Page 3: ...l regulations In the USA follow the requirements of the National Electrical code NFPA 70 2005 and 780 2004 Installation of Lightning Protection Systems In Canada follow Section 54 of the Canadian Electrical Code These codes describe correct installation procedures for grounding the outdoor unit mast lead in wire and discharge unit size of grounding conductors and connection requirements for ground...

Page 4: ...e with bends and curves kept to a minimum Grounding cables must not be installed with drip loops All bends must have a minimum radius of 203 mm 8 in and a minimum angle of 90 A diagonal run is preferable to a bend even though it does not follow the contour or run parallel to the supporting structure All bends curves and connections must be routed towards the grounding electrode system ground rod o...

Page 5: ...cts are still possible but mounting in this zone significantly reduces the possibility of a direct strike Mount equipment in this zone Equipment Zone B Zone A Zone A 50 m Zone B Warning Never mount equipment in Zone A Mounting in Zone A may put equipment structures and life at risk SITE GROUNDING SYSTEM Confirm that the site has a correctly installed grounding system on a common ground ring with a...

Page 6: ... follows 1 Depress the retaining clip then remove the bottom cover of the connectorized device 2 Remove the knockouts from the bottom shell cover for GPS Ethernet and grounding cable routing Remove any remaining plastic burrs which may damage cabling 3 With a Philips screwdriver remove the GPS cover 2 screws radio protective cover and radio mounting bracket 4 screws to prepare the antenna for GPS ...

Page 7: ...ically 5 Reattach the radio mounting brackets to the sector antenna with a Philips screwdriver 4 screws ensuring that the GPS antenna cable is routed through the opening at the bottom of the radio mounting brackets 6 Attach the radio module to the sector antenna by hooking the top of the unit to the bracket then installing the retaining thumbscrew ...

Page 8: ...d sector antenna cables then use overlapping wraps of vinyl tape to seal 9 Reinstall the antenna s GPS cover and 2 screws with a Philips screwdriver then reinstall the connectorized device antenna cabling cover and bottom shell cover ensure that the bottom shell is latched you may need to hold the tab latch open when reinstalling the bottom cover ...

Page 9: ...cable to the power supply port labeled Gigabit Data Power 2 Connect an Ethernet cable from your management PC or network to the power supply port labeled Gigabit Data 3 Connect the power cord to to power supply then plug the cable into an electrical outlet Ensure that the power supply LED is lit green ...

Page 10: ...straps and antenna bracket Next tighten the 4 included flange nuts with a 13mm wrench The antenna s tilt may be adjusted from 3 to 12 The antenna should not be mounted at the highest point of the tower If installing the antenna with a GPS antenna ensure that the GPS antenna has a clear view of the southern horizon To determine down tilt or up tilt setting in degrees 1 Determine the height of the A...

Page 11: ...aining clip then remove the bottom cover of the device 2 Pack the Ethernet port with dielectric grease then plug one end of an Ethernet cable into the device Main ETH port 3 Open the included metal strap with a flathead screwdriver 4 Slide the metal strap through the mounting bracket and around the pole tighten with a flathead screwdriver ...

Page 12: ... device bottom shell cover POWERING ON THE INTEGRATED RADIO 1 Connect the integrated radio Ethernet cable to the power supply port labeled 10 100 Mbit Data Power 2 Connect an Ethernet cable from your management PC or network to the power supply port labeled 10 100 Mbit Data 3 Connect the power cord to to power supply then plug the cable into an electrical outlet Ensure that the power supply LED is...

Page 13: ...y Red 10BaseTX link Green 100BaseTX link Orange 1000BaseTX link Unlit No Ethernet link established INTEGRATED MODULE LEDS LED Function POWER Green Power is applied to the device Unlit No power is applied to the device or improper power source ETH 1 Main Primary Ethernet port indicator Once lit blinking indicates Ethernet activity Green 10 100BaseTX link ETH 2 Auxiliary Secondary Ethernet port indi...

Page 14: ...r than the top of the tower or its lightning air terminal The metal tower or mast must be correctly grounded Surge Suppressor External ground bar Ground ring Outdoor CAT5e cable shielded with copper plated steel Equipment building AP Ground Cable Tower building ground system Cat5e cable Port Gigabit Data Power Network switch Port Gigabit Data Power supply To power mains Note The Cambium 600SSH sur...

Page 15: ...a metal tower or mast then in addition to the general protection requirements see section Safety the following requirements must be observed The equipment must be lower than the top of the structure or its lightning air terminal The metal tower or mast must be correctly grounded External ground bar Ground cable Ground ring Outdoor CAT5e cable shielded with copper plated steel Equipment building Bu...

Reviews: