Overview

ALS

500T-RMW-HC

INSTALLATION INSTRUCTIONS

IMPORTANT NOTICE:

 

VERIFY CORRECT LUMINAIRE WAS RECEIVED WITH 

CORRECT COLOR TEMPERATURE, VOLTAGE, AND WATTAGE BEFORE CUTTING OR 
INSTALLING. CALI WILL NOT BE RESPONSIBLE IF INCORRECT LUMINAIRE IS INSTALLED.

READ ENTIRE GUIDE BEFORE STARTING INSTALLATION

• Electric Hammer Drills (optional)    
• 14.4 to 28 Volt Cordless Drills          
• Phillips Bits - Sufficient Quantity    
• Utility Knife
• Electrical Cords                   
• Marker 
• Wire Strippers

• Long Nose Pliers
• Drill Bits - Concrete or Wood
• Electrical Three Ways
• Safety Glasses
• Measuring Tapes
• Chalk Line 

             

• ALS500T-RMW can be mounted to concrete, wood, or metal using proper
   mounting hardware.
• Ensure surface material can support the weight of the luminaire.

ELECTRICAL

INSTALLATION RECOMMENDATIONS

INSTALLATION TOOL REQUIRED

• ALS500T-RMW requires a remote driver. The driver may be mounted on
   top of the luminaire or in a remote location.
• Drivers are 120V - 277V (UNV) Input Voltage and 24VDC Output Voltage
• To calculate driver size, determine Watts per Foot.
   

Example:

 4W per Foot

• Determine Length in Feet.
   

Example:

 20’

• To calculate Load, Multiply Watts per Foot x Length in Feet
   

Example:

 4W x 20’= 80W. The Load of the driver is 80 Watts.

• Maximum load for a Class 2 low voltage luminaire is 96 Watts

END VIEWS (With Hard Ceiling Trim)

1.38”

3.27”

7.25”

3.60”

Max.

7.0”

1.72”

Hanging Bracket Assembly

(ALS500T-RMW-HB)

1.72”

5.27”

X (Specified Length)

1.38”

7.25”

Aircraft Cable Assembly

(ALS500T-RMW-AC)

• Indirect lighting
• 24 Volts DC for easy and safe installation 
• Long life, energy efficient LEDs
• Available in 4 Watts up to 12 Watts Per Foot 
• Can be ordered to specific lengths for when exact dimensions are known 
   

Example:

 10 x 10’6” (product is shipped in 8’ max luminaires)

• Available for indoor (DRY) and (DAMP) rated installations

PRODUCT INFORMATION

CONTENTS

DESIGN GUIDELINES

Page 2

HANGING BRACKET MOUNTING

Page 3 - 5

AIRCRAFT CABLE MOUNTING

Page 6 - 9

REFLECTIVE FILM

Page 14

TROUBLESHOOTING

Page 15

CARE & MAINTENANCE

Page 16

FEATURES

APPLICATIONS

Indirect Lighting

LENS

Clear

LENGTH

Built to Order (± 0.25” Tolerance)

CONSTRUCTION

Aluminum Extrusion

FINISH

White Powder Coated

DRIVER

Remote

WEIGHT

4.50 lbs per foot

MOUNTING

Mounting Brackets or Aircraft Cable

LISTING

Dry or Damp Location
UL1598, CSA C22.2#250.0
UL8750, CSA250
UL2108, CSA C22.2 #9

TEMPERATURE 

RATINGS

Operating / Startup:

 -20° to 48°C (-4° to 120°F)

Storage:

 -40° to 76°C (-40° to 170°F)

Summary of Contents for alumLEDs ALS500T-RMW-HC

Page 1: ...and 24VDC Output Voltage To calculate driver size determine Watts per Foot Example 4W per Foot Determine Length in Feet Example 20 To calculate Load Multiply Watts per Foot x Length in Feet Example 4W x 20 80W The Load of the driver is 80 Watts Maximum load for a Class 2 low voltage luminaire is 96 Watts END VIEWS With Hard Ceiling Trim 1 38 3 27 7 25 3 60 Max 7 0 1 72 Hanging Bracket Assembly ALS...

Page 2: ...ource To Power Source Circuit 2H White Circuit 1H Gray KEY A Standard Length Luminaire runs are constructed in 8 segments B Custom Length Any required length that is not 8 Typically the last segment of a run C End Cap Used to terminate a run D Mitered Corner Standard 90 Mitered Corner Custom angles available upon request E Jumper Cable Used to connect two luminaires with a gap between F Driver The...

Page 3: ...without prior notice 5 20 2021 Rev 3 Page 3 of 16 ALS500T RMW HC INSTALLATION INSTRUCTIONS Diagram of Assembly Hanging Bracket Assembly Wall Stud Connector Block Lens Trim Retention Spring Hard Ceiling Trim Rail Bracket Hex Head Screw 8 32 x 2 Hex Screw Channel Lock Washer Hex Nut Hanging Bracket Arm Hard Ceiling 5 8 Drywall 1 8 Mud Wall Trim Reflective Film Tie Wire DIAGRAM OF ASSEMBLY 3 60 Max H...

Page 4: ...luminaire by sliding inverted Hex Head Bolts of Hanging Bracket into the channels pictured below Do not slide into any other channels 7 If applicable install end caps to ends of runs 8 6 15 16 Projected Location of Hard Ceiling 5 8 Drywall 5 8 Drywall Wall Stud Ceiling Line Ceiling Line 4 Top of drywall Mark Wall Stud 1 16 Ceiling Line Mount Wall Trim Install concealed ceiling system grid Assemble...

Page 5: ...ging Bracket assembly Use a dummy piece of drywall to perfect the height at which the luminaires will rest The drywall will be tucked into the gap between the Hard Ceiling Trim and the concealed ceiling grid when hung Note One person holds the luminaire and another person adjusts hex nuts 12 Secure a tie wire to each Hanging Bracket Arm after luminaires are set in place Note Refer to the diagrams ...

Page 6: ... the right to make changes or withdraw specifications without prior notice 5 20 2021 Rev 3 Page 6 of 16 ALS500T RMW HC INSTALLATION INSTRUCTIONS Diagram of Assembly Aircraft Cable Assembly 5 8 Drywall 1 8 Mud Wall Trim Reflective Film Wall Stud Lens Trim Retention Spring Hard Ceiling Trim Hard Ceiling Aircraft Cable Assembly DIAGRAM OF ASSEMBLY 5 53 1 38 3 27 5 08 1 36 DIMENSIONS ...

Page 7: ...16 above ceiling line Note Drywallers must hang drywall to the specifications Only cut if necessary 2 Mark locations along Wall Trim extrusion where it will be mounted to wall studs then drill holes as needed and mount to wall studs Note Mount Wall Trim extrusion using at least 1 screw per 2 rounded up 3 Determine locations where Aircraft Cables will be mounted overhead Secure to a sturdy surface ...

Page 8: ...ave been mounted Note Refer to steps on page 12 for details 12 Install Ceiling Trim after all luminaires have been mounted and connected Note Follow the steps on page 13 to install Ceiling Trim 13 Hard Ceiling Trim flush with projected location of ceiling drywall Ceiling Line Trim excess cable Adjust length as needed Unscrew lift Press down hold Pull cable Adjust Cable Gripper by unscrewing lockin...

Page 9: ... from driver Verify wiring diagram before connecting 16 Perform a continuity test before connecting luminaire to power source Refer to page 15 for continuity test step by step 17 Verify driver wire colors from wiring diagram then connect luminaires to power source Drivers used for this product vary Always confirm wiring diagram from driver installation instructions before connecting 18 After all i...

Page 10: ...ket Rail Bracket ALS500T RMW 6 8 Hanging Bracket Rail Bracket For luminaires 1 long use 1 Rail Bracket and 2 Hanging Brackets Install 2 Hanging Brackets 2 from each end of 1 Rail Bracket Align the 1 Rail Bracket with the 1 luminaire For luminaires 2 5 long use 2 Rail Brackets and 2 Hanging Brackets Install 1 Hanging Bracket in the center of each Rail Bracket Align the Rail Brackets with the end of...

Page 11: ... 1 5 Aircraft Cable Assembly 4 ALS500T RMW 6 8 Aircraft Cable Assembly 4 For luminaires 1 5 long use 2 Aircraft Cable Assemblies per luminaire Install each assembly about 4 from each end of luminaire Note Location may vary depending on accessibility mounting surfaces Ensure each luminaire is balanced For luminaires 6 8 long use 3 Aircraft Cable Assemblies per luminaire Install 1 assembly centered ...

Page 12: ...ale Block to meet the Female Block Tighten Allen Screws using provided Allen Wrench to close the gap until luminaires meet Only tighten screws until extrusion edges meet with no gaps Over tightening screws will create separation at the seam Tip One person holds the luminaire together ensuring there is no gap while another person tightens screws 3 If applicable insert one Allen Screw with Lock Wash...

Page 13: ... between trim and fixtures not aligned Install Trim Retention Springs to ceiling trim Use one clip per 2 or two clips per segment under 4 Install clips 4 from each edge evenly spaced 3 Measure and cut a 2 section from one of the Ceiling Trim segments 2 Measure installation area to determine required lengths of Ceiling Trim Example 16 required two 8 sections of Ceiling Trim 1 Install Ceiling Trim w...

Page 14: ...URES MAINTENANCE SPECIFICATIONS REFLECTANCE 550NM 97 5 0 8 ASTM E1164 L VALUE 98 9 ASTM E308 A VALUE 0 35 0 25 ASTM E308 B VALUE 0 90 0 30 ASTM E308 GLOSS 60 5 0 ASTM D2456 THICKNESS 205 µm 15 Ono Sokki EG225 TENSILE STRENGTH 165 MPa ASTM D882 DEFORMATION TEMPERATURE 130 C JIS K7196 1991 MELT TEMPERATURE 255 C ASTM D3418 UL RELATIVE THERMAL INDEX 105 C UL746 Installation Area Reflective Film Pulle...

Page 15: ...th is formed between the positive and negative wires the multimeter will beep flash or read 0Ω ohms Troubleshoot to identify the malfunction in the line If there is no conductive path the multimeter will not show any feedback 5 Touch the red probe to the fixture extrusion and the black probe to the positive wire If a conductive path is formed between the extrusion and the positive wire the multime...

Page 16: ...actory for any malfunctions Do not attempt to repair Only use alumLEDs with specified rated voltages Do not exceed the specified voltage for any alumLEDs luminaire Do not use alumLEDs extrusion as a raceway for additional wire Non factory feed through wires inside alumLEDs will void warranty Ground Fault Circuit Interrupter GFCI protections should be provided on circuits or outlets when alumLEDs i...

Reviews: