TOTAL LITE Revision 1
SERVICE MANUAL FOR INNOVATION
TOTAL LITE
Single-Cup Brewer
35
7
INITIAL SETUP
Before you install the brewer on location, we strongly suggest that it be unpacked, inspected and
bench tested before you leave your warehouse.
Overview of installation steps
7.1
Installation site requirements
7.2
Unpacking
7.3
Leveling the Equipment
7.4
Hot Water Tank Preparation
7.5
3 Beans Canister Installation
7.6
Water Line Connection
7.7
Electrical Connection
7.8
Water Temperature
7.9
Loading Products
7.10
Chute System Installation
(optional)
7.11
Filter Paper Installation
7.12
Installation Testing
7.1
Installation site requirements
Operating environment
For indoor use only
Power Supply
Ensure that this unit will have its own electrical circuit and located within 6 feet of the dedicated
electrical outlet.
Use only a polarized grounded receptacle.
Domestic
115 VAC / 60 Hz - 15 A Circuit
Water Supply
Should be a plastic 1/4” or 3/8’’ O.D. dedicated line branched off a larger line. An easily accessible shut
off valve up stream of the unit is highly recommended for ease of installation.
Water pressure should be at least 20 PSI and no more than 80 PSI.
Tools Required
#2 Philips screwdriver
Regular medium pliers
Adjustable wrench
Level indicator
Other tools may be required depending on the type of water supply tubing and location.
Initial Setup