SERVICE & INSTALLATION MANUAL for Cafection’s Total Lite
9.4
Main Board
Like all electronic main boards, they are very sensitive to power surges in the building. If this is your
reason for changing the main board and this persists, verify your power source. Use the necessary
precautions for handling static sensitive devices.
Removing
1. Retrieve all your data. (See section 6.6.2)
2. Turn off the machine and unplug from the outlet.
3. Open the door and remove the protection panel via the 4 screws.
4. Unplug the connections: (Clockwise from the top left corner):
MDB Port
J11
(if coin changer, bill acceptor or card reader)
Main Board
: J12, J18, J27, J2, J19, J3, J6, J14, J21, J22
5. Unscrew 4 plastic 1” posts.
6. Remove the board.
Replacing
1. Replace the board and fasten with the 4 posts.
2. Plug the connections and refer to the board diagram for a full-size view (section 4.15).
3. Verify that everything is in place, the board will fail if the connections are reversed or in the
wrong place.
4. Replace all parts in the reverse order. Replace protection panel with the 4 screws.
5. Plug in the brewer and turn it on.
6. Verify on the screen that all is functioning.
All cables must be replaced in the correct order and direction before turning the
power on or the board will fail and be damaged.