INNOVATION TOTAL LITE Rev. 1 2021-10
www.cafection.com 800-561-6162
20
SERVICE & INSTALLATION MANUAL for Cafection’s Total Lite
ALWAYS unplug the main power cord from the power outlet (AC line voltage) when
servicing any electrical components on the equipment.
4.8
Electrical Connection
This equipment must be installed in compliance with applicable federal, state,
provincial and/or local electrical codes having jurisdiction.
Make sure:
- The equipment is OFF before plugging it in.
- The equipment has its own electrical outlet.
- NO extension cord is used.
1. Locate the unit’s power cord and remove it from its transport socket. Discard the transport
water tank safety part (recyclable).
The transport water tank safety part keeps the float out from moving during
transport. The water tank will not fill if this part is not removed.
2. Make sure the power switch at the back of the unit is in the OFF position before plugging in the
unit into its own grounded electrical outlet.
3. Access the back of the brewer and toggle the power switch to the ON position. Water will
automatically enter the brewer. The filling cycle should take a maximum of 2 to 3 minutes.
4. Once the tank is full, water will take 10 to 20 minutes to heat to brewing temperature.
5. Once the coffee machine is ready, the selection screen will appear.
OFF position
In
it
ia
l S
e
tu
p