background image

UNIZINC

Installation 

Guide

Doc   G13 Rev 1
Date   03.09.2021

Summary of Contents for UNIZINC

Page 1: ...UNIZINC Installation Guide Doc G13 Rev 1 Date 03 09 2021...

Page 2: ...SEMBLED VERTICALLY 4 INDIVIDUAL SYSTEMS WHOSE HEIGHT EXCEED SIX TIMES THE DEPTH OF THE SHELVING MUST BE ANCHORED TO THE WALL IN THE UPPER PART 5 MINIMUM EXTENSION STRENGTH OF THE ANCHORING 150N 15KG 6...

Page 3: ...2 FRAME BRACING UNIZINC Frame Height 2475 Number of Braces Required 3 Position of the Bracing upper Slot 1 5 2 29 3 61...

Page 4: ...3 UNIZINC UPRIGHTS This image below shows the upright positioned the correct way up Smaller cutouts immediately above the larger ones TOP BOTTOM Smaller cutouts Larger cutouts...

Page 5: ...UNIZINC Insert the plastic foot 1 in the lower part of the upright 2 4 PLASTIC FOOT ASSEMBLY...

Page 6: ...have settled the uprights correctly upper and lower part Insert the bracing in the internal side of the up right 1 and block it by bending the tang 2 to wards the inside To ensure bracing does not mo...

Page 7: ...a length of metal terminated by Red clips Insert the cur s lower hooks into the back holes of the upright 1 then turn the beam insert the upper hooks too and finally push down 2 IMPORTANT NEVER USE A...

Page 8: ...7 ASSEMBLY OF SHELF PANELS Insert the shelf panel 1 in the groove of the beam 2...

Page 9: ...S Fix the blocking beams 1 to the upright 2 with self tapping screws Use 1 blocking beam on each run and every 5 modules Run of 3 modules 1 blocking beam Run of 8 modules 2 blocking beams Run of 11 mo...

Page 10: ...ing gondola units together use side clips Please ensure to avoid slipping these are self tapped into place When connecting gondola units together use double feet to retain a level unit and avoid damag...

Page 11: ...VERSATILITY CUSTOM DESIGN RESISTANCE CUSTOMER CARE Magrini UK ltd CAEM UK Unit 3 Jamage Industrial Estate Talke Pits Stoke On Trent ST7 1XW UK T 01782 794500 information caem co uk caem co uk unizinc...

Reviews: