background image

 

 

 

 
Tools Needed: 

 

Phillips screwdriver or 

 

3 mm hex head wrench 

 

Rubber mallet 

 

 

Step 2:    

Remove the (4) upper screws (circled       

in red).  

Step 4: 

 Roll handle forward,  gently tap outwards 

using a rubber mallet then remove top half of 
frame.. 

 

 

 

 

 

 

 
 

Step 5:   

Once top half is off, remove the lower  

(4) screws, circled in red.  

 

 

LOWER JOINTS REPLACEMENT 

 

Step 1: 

Note the orientation of the unit and 

confirm the left and right lower joints. 

Step 3: 

To get screw out, loosen the joint 

(red arrow) and squeeze together (red circle). 

 
 
 
 
 
 
 

 
CAUTION:  

When removing the top half of 

frame, DO NOT over extend sensor wires. 
 

 

 

 

 

Step 6:   

Using a rubber mallet, tap upward to 

remove lower joints.

 

 

 
 
 
 
 
 

Pg. 1 of 2

  Right                                    Left 

Reviews:

Related manuals for R2 S-Series