background image

BS81081841 

I. Installation Notice

1.Install water pipes in accordance with this manual.
2.Floor drain should be installed in the location of the faucet.
3.

Rough-in box should be installed before ground construction. The 

   associated mixer should be installed after the ground construction. The 

   rough-in box on the inlet base shall not be cut or removed, and shall be 

   protected to avoid damage to each rough-in box and inlet base during 

   construction.

4.Clean pipes before installation to get rid of mud,sand or other debris.
5.If the thread of pipes don’t match well with product, please find out the 
   reason first, otherwise a forced connection will damage the faucet.
6.After installation, check all the joints to ensure they are firmly connected.
   Then keep water flow. Turn on and off repeatedly to ensure there is no 
   leakage around the joints.At this stage, the product is ready for normal use.
7.Keep the manual to the user.

II.



Operation Notice

1.The working condition of this product is  water pressure 0.05~1.0MPa,
   water temperature 4~90°C.
2.Do not hang heavy things on the faucet.
3.Make sure the faucet is off when no water comes out of it, especially when 
   nobody resides in or during the period of decoration or suspend of water.
4.Regularly clean the surface of faucet to keep it bright. Attention: do not use 
   inappropriate tools such as sharp brushes, rough sponges, scouring pads 
   or corrosive detergent to clean the faucet. It is not recommended to use 
   the detergent sold in the market, because its formula changes frequently. 
   Please clean the faucet by a wet cotton cloth with soapy water, then rinse 
   and dry with a soft cotton cloth after each time of usage.
5.When the room temperature drops to below 0°C, take necessary measures
   (such as keeping faucet warm and closing windows) to prevent the faucet 
   from being frozen or even broken (especially when windows kept open for 
   air ventilation while nobody resides in).
6.Please open the cold and hot water in turn and adjust to comfortable 
   temperature before use to avoid scald. 
7.Do not disassemble the product without the help from the professionals..

III.



Installation Diagram

IV. Installation Steps

(

Fig.1-19

)

The installation diagram is only for reference. 

The product is subject to the real object.

Prepare and check

the following tools.

Drill

Goggles

Spanner

Teflon Tape

Level

Silicone

Sealant

Pencil

Saw Blade

S6 Wrench

(supplied)

S5 Wrench

(supplied)

S4 Wrench

(supplied)

S2.5 Wrench

(supplied)

Mark position based on the mounting 

holes of the rough-in base and drill 

four 

Ø8

holes. (Attention 

the “HOT”

mark on the rough-in base is hot water

inlet should face towards the bathtub.)

M8 Screw

Mounting hole

 Rough-in base

Ø8

hole

Last revision: November 13th

#30311

Floor mount tub filler with hand shower

INSTALLATION GUIDE

Reviews: