2. Transportation and storage manual
Please observe the following criteria after packing:
(1)
Don’t tilt the packing boxes for more than 15° during handing.
(2)
Please follow the instruction labels
“up” and “down” during
placing the packing boxes and avoid placing them upside down during
transit.
(3)
Be careful while handing the boxes during transit, and avoid
heavy pressure or jolting of the boxes.
(4)
The packing boxes should be protected from rain.
(5)
Transportation conditions should conform to the requirements of
the packing boxes and of the modules regarding their environmental
conditions.
3. Installation
3.1 Warning
(1)
Do not use mirrors or other magnifiers to artificially concentrate
sunlight on the module.
(2) Do not touch the connectors with bare hands and use insulated
tools during electrical work.
(3) Although the glass surface of the modules is rather durable and
able to withstand pressure, the glass might break (and the module will
no longer work properly), if it is dropped or hit by tools or other heavy
objects.
(4) Under certain conditions, the module might produce a higher
electric current and/or voltage than measured under standard test
conditions. Accordingly, the values of I
sc
and V
oc
marked on this module
should be multiplied by 1.25 when determining the component voltage
ratings, conductor current ratings, fuse sizes and size of controls
relating to the PV output.
(5) The installation work of the PV array can only be done under
the protection of sun-sheltering covers or sunshades, and only qualified
persons should install modules or perform maintenance work.
(6) Systems should be installed by qualified personnel only and at
least by two persons. The system involves electricity and can be
dangerous if the personnel are not familiar with the appropriate safety
procedures.
(7) Follow the recommendations of the battery manufacturer if
batteries are used with the modules.
Please observe national and local
laws and regulations when installing modules. If required, an
architecture license should be obtained before carrying out this work.
(8) Please unpack carefully.
(9) A visual inspection should be carried out before installation, in
order to make sure that there is no defect in the packing, the junction
box or on the surface of module.
(10)The user should design and select a metallic bracket for
installing that is suitable to bear the weight of the PV modules. The